Laserfiche WebLink
��v <br /> � � r <br /> PUBLIC VVORKS PERMIT COMh1ENTS <br /> 4. Connect side sewer per City Standard#001. <br /> i' 5 � Connect side sew�r per City Standard#'s 601, 602, 604. <br /> (�! Connecl all rooftop downspouts to the side sewer. <br /> 7. Connect rooftop downspouts to the drainage system providetl for this lot. <br /> 8. Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett Storm <br /> Manual 3-2.6.2. The approximate size trench is 3.5'wide, 2'deep and 25' long. See attachment ior <br /> more details. <br /> j 9,� The contractor must meet with the Public Works Inspector to�iscuss potential drainage routing prior <br /> to beyinning the project. <br /> (10. ` Install erosion conirol measures as delermined by the Public Works inspector, such as silt fence, <br /> �—� straw bales, swales, or erosion blankets. <br /> 11. � Install erosion control measures per City of Everett Standards for small parcels <br /> 12,� Remove erosion control measures upon completion of!he project prior to final approval of the permit. I <br /> /13.`J All excavaled material from foundation, sidewalk and driveways shall be haulad to an approved, I <br /> � permitted site. No wasting of material is allowed on this buildin� lot. <br /> 14.,' No dirt, mud, rocks or debris to be tracked onto roadway. <br /> 15.; No building materials to be stacked on sidewatks and sidewalks to be kepl clean and epen for <br /> pedesUian lravel. <br /> �6. Adjust water meter box 1" above sidec.alk grade. <br /> /r' <br /> 17..' Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A & 306 <br /> on this proposal's frontage as directed by the Public Works Inspector(i.e. a'I unused driveways and any <br /> broken or damaged area must be replaced). <br /> � 18. Install a Type I concrete drivew2y per City of Everett Standard #307. <br /> r 19. Pave driveway from the front property line out to the street paving. <br /> � ,. <br /> 20. Contact lhe Water Dislrict for connecting provisions for lhis buildiny's �vater and <br /> sewer services. <br /> 21. A catch basin as per City Standard Plan #402 with a gas trap E�er Standard Plan�410 is required for <br /> lhe parking area. <br /> 22. If a sewer pump system is to be installed, the pressure line must discharge into a private manhote, <br /> then gravity flow across lhe public right-of-way. <br /> ?3. A sprinkler system is required for this bui;ding in compliance with the requirements ' <br /> ' j . <br /> 1 <br />