Laserfiche WebLink
� <br /> ' �„r,,, i <br /> . �j G1 C,� r , �, <br /> � <br /> � DE.,CRIPTION OF AN ASSURED <br /> ��'"""� EQUIPMENT GROUNDING CONDUCTOR PRQGRAM <br /> JOB-SITE INFORMATION: I <br /> �_���,ioyec _�y.e.1�1s�L�d Constructiod Co . ,_Inc . <br /> lJaineorlocationof Coast iYide Supply 2210 37th st . <br /> censt�uction site: <br /> Perso�, toin,�lemenc Larry Kanikeberg, Project Superintendeiit <br /> the piocedure: <br /> Tlie pnrson namod ,bove shnll ba desipnatod as bein9 compotent,pursuani to WAC 296-155�012131. This person shall bo <br /> capable of Idunti f ying hazards relat ing to �rounding and sholl have ine au Ihority�o see ihal any corrections are made such Ihot <br /> each ilem on a given job site Is adequately grounded. The procedure described is suitable for complianco wltb the require� <br /> ment; of WAC 296�155-0301BIIcllil. h is the policy ot tlio above�signed to estoblish and implement on Assured Grounding <br /> Cunduqor Program covering n tes�far continuous circuitry performed on: <br /> (a) Curd sets aud receptacles not u parl ol the permanent wiring of 6uildingf or simcWres,nnd: <br /> (b�All Eleclri[al rquipmenf anA IaoL•useJ in conneclion with proce;;es of roeslruction or ultorations. <br /> POLICY: <br /> Ground F�ull Circuit Imerrup[ers IGFCI) are reyuired by Ihe captionod cade;for all 120�volt,single�phase, 15�20 ampere receptacle <br /> onlleL• which are no� a por� of ihe pennanen� Wjring ol a builCinp or slructum nl/or on a consiruclion project.As an eltornative to <br /> Ihe Grnwid FauI1 Circuil Interrupler requirement, i1 •.vill be tlie policy of Ihe undersi�ned to insiruc� employeos not to use eny <br /> equipment Ih�q does not meel Ihc requiremenfs o�Ihe Assured Gruunding Progrmn. � <br /> PROCEDURE: <br /> NI equipment to he used on the consiruction site shall be tested, identified and coded using the (ollowing procedures� <br /> wilh the excention of the "double insulated".rystem,which nr.ed not be tested. <br /> TEsrirac: <br /> 6 All equipment shall be tested before fiist use for grounding and continuiry of the circuitry. <br /> O Equipment returned to service (ollowing repairs sliall be tested (or continuity before being <br /> used. <br /> O Theso tests shall be done quarterly, a( inlervals not uxceeding once every three months. <br /> • Tested equiument shall br, iclentitied by use of color coding. Two (2) colors shall he used. <br /> First color to iden�ity �he Quarterand ihe second ro identity Ihe Month wiU�in the quarter. <br /> s Fquipment shall be visually inspected before usn oach day for external defecis, induding <br /> dr,furmed or mis;iny pins, insulation damage and indications of possiblc internai damage. <br /> Gquipment sliall not be usr.d wnil rr.paired, retested and results rewrded. <br /> RECORDING: <br /> The aforementioned tests shall he rewrded on Ihe attached scl �dule and retained at the jobsite. <br /> i <br /> E�TiPloyer <br /> Geo ge S. Newland, President <br /> Note: Color eoding sclieme and logs are attached. Revised June, 1979 <br />