My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2210 37TH ST 2018-01-02 MF Import
>
Address Records
>
37TH ST
>
2210
>
2210 37TH ST 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2019 9:25:15 AM
Creation date
3/31/2017 10:03:31 AM
Metadata
Fields
Template:
Address Document
Street Name
37TH ST
Street Number
2210
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 SWPPP ANALYSIS AND DESIGN <br /> Design of the SWPPP Plan was completed in conformance with Volume II of the <br /> Drainage Manual. Compliance with the 12 elements is summarized below. <br /> Element 1: Preserve Vegetation / Mark Clearing Limits: Clearing limits have been <br /> delineated on sheet ER-01 of the construction plans. The clearing limits extend only <br /> to those areas that will be disturbed during construction of the subject project. The <br /> specific BMPs for marking the clearing limits that will be applied for this project <br /> include: <br /> • High Visibility Plastic Fence (BMP C103) <br /> Element 2: Establish Construction Access: The existing paved driveway will be <br /> utilized for a construction entrance. Due to the scope of the project, street sweeping <br /> is proposed to reduce/eliminate track-out from the site. If track-out becomes an <br /> issue, BMPS such as Wheel Wash (BMP C1O6) or shaker plates will be implemented. <br /> See sheet ER-01 of the construction plans for location. A detail is also attached on <br /> sheet ER-02 of the construction plans. The specific BMPs related to establishing <br /> construction access that will be used on this project include: <br /> • Wheel Wash (BMP C1O6) <br /> Element 3: Control Flow Rates: Due to the scope of the project, minimal changes to <br /> flow rates are expected. Temporary and permanent flow control measures are not <br /> proposed as part of this project. <br /> Element 4: Install Sediment Controls: Sediment control will be provided using Silt <br /> Fence (BMP C233) and Straw Wattles (BMP C235). The specific BMPs for sediment <br /> control that shall be used on this project include: <br /> • Silt Fence (BMP C233) <br /> October 2013 2-1 LDC Job No. 13-118 <br />
The URL can be used to link to this page
Your browser does not support the video tag.