My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1307 38TH ST 2016-01-01 MF Import
>
Address Records
>
38TH ST
>
1307
>
1307 38TH ST 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2017 10:09:28 AM
Creation date
3/31/2017 10:08:56 AM
Metadata
Fields
Template:
Address Document
Street Name
38TH ST
Street Number
1307
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
25 . Dumpsters ovar 1 . 5 cubic yards capacity must be located <br /> a minimum of 5 feet from the buildinq (UFC 11 . 302(b) , <br /> 1991 Edition) . <br /> 26 . Fire safety prartices during construction must be in <br /> compliance with the Uniform Fire Code, 1985 Edition, <br /> Article 87, "Fire Safety During Constructio.�. " <br /> 27 . The proposal must also comply with all other City Code <br /> and Ordinance requirements not specifically set forth <br /> herein. <br /> GENERAI, INFORHATION <br /> 1 . The Police Department has the following security <br /> recommendations: <br /> a. The perimeter doors should be solid core with 190 <br /> degree to 220 degree wide angle viewers and single <br /> cyli��der dead-bolts with l." throw and at least 3" <br /> screws securing striker plate. <br /> b. Bay windows should overlook the park_.ng lot for <br /> i�creased security of vehicles . <br /> c. Sliding glass doors should have Charlie b3rs <br /> installed for optimum security. <br /> e. Mailboxes should be centrally located in an area <br /> highly visible to the apartments. <br /> g. During the final stages of construction, please <br /> contact Dick Thornberry, Crime Prevention Officer, <br /> at 259-0416 for further security recommendations. <br /> 2 . The Snohc:nish County PUD currently has sufficient <br /> capacity to serve the proposed development. For <br /> further information about the electrical service <br /> requirem-ants for this project, please call Kurt Martin <br /> of the Di�trict's Customer Enqineering Office, Everett <br /> at 258-�91 . <br /> 3 . GTE Northwest Incorporated has facilities near this <br /> location. However, any building entrances must be <br /> .^oordinated at least 60 days in advance. '1'he cost of <br /> ahy relocati;on of GTE facilities that is required to <br /> construct the new apartments will be at the total <br /> expense of the developer. Any relocation will take 60 <br /> to 120 days. <br /> Please contact Michael Hupf, Senior Engineer, at 356- <br /> 4052 should you require additional information. <br />
The URL can be used to link to this page
Your browser does not support the video tag.