Laserfiche WebLink
� <br /> _._ _— -- � l <br /> �i' Bob Landles, Ptanning Dp^�rt ent_ <br /> � . D +i. <br /> FROM Public Works Department ' 1/5(/� � � � �� pn . � - <br /> DATE ]UIy 3O, lIHO l/ �� <br /> S�a,E�, � Auc -1 rs�o <br /> �.E.P.P1. Checklist Review /�80/59 CITR{�� R EVERETT WASHINGTON <br /> P��g pe�f��, <br /> PROPOSAL: <br /> Construction of a warehouse approximately 6,000 ft2 at the S.E. corner of <br /> 38th and McDougall. <br /> RECOMMENDATIONS: <br /> It is the recommendation of the Public Works Department that issuance of a Negative <br /> Declaration be subject to the iollowing: <br /> 1. A detailed drawing shall be submitted to the Public Works Department showing <br /> parking layout, landscaping, temporary erosion control, driveways, utilities, <br /> storm drainage, and all required improvements to the public right-of-way. <br /> Pubiic Works Department approval of these drawings is required before any <br /> permits are issued. All improvements shall be completed before the Occupancy <br /> Perniit i� issued. <br /> t `,�. As-bui'ts, easetn�el�t, and a-one year Warrant�e Bond tn the amount of 10% of <br /> '�� the cost of construction of the public wateP syst m ar�equired within 10 working <br /> „�ti days of�obtaining publ�watek connectiory <br /> �Q�,o�w'�V,c� , <br /> iyY`; �,>-� 2. City streets are to be kept clear of dirY and debris during construction. <br /> l�,J,�S ,� �i <br /> 3. During construction, all truck t-affic to and fr��m the site within the City of <br /> Everett shall be on arterial streets unless otherwise approved by the Public Works <br /> Department. <br /> 4. !Durticipation in the cost to fund the North End Sewer Interceptor installation <br /> is required. <br /> 5. On-site detention is required. Drainage calculations to be submitted <br /> on City Drainage Plan submission form. Reseeding of exposed earth is required <br /> within 30 days of cornpletion of earth work. <br /> 6. A preconstructicn conference on Civil Engineering por'iu� of project is required <br /> prior to approval of Public Works Permit. The applicant shall ar-ange meeting <br /> involving applicant, job superintendent, con�ractor, all subconiractors, Fire <br /> Marshal, Planning Department Coordinator, Building Department Coordinator, <br /> Publ;c Works Coordinator, Public Works Inspector, and City Traffic Engineer. <br /> 7. A temporary erosion control plan is required. � <br /> 8. Explanation of pedestrian easement indicated on site plan is required. <br /> 9. A covenant Power-of-Attorney is required for future.tocal Improvement District <br /> for the improvement of 38th Street. � <br /> a.�� <br /> !0. A drawing is required to show how vehicle loadingA'r unloading will occur on <br /> site. The public driving lanes cannot be used for warehouse operation. <br />