My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2410 38TH ST 2016-01-01 MF Import
>
Address Records
>
38TH ST
>
2410
>
2410 38TH ST 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2017 10:28:00 AM
Creation date
3/31/2017 10:27:38 AM
Metadata
Fields
Template:
Address Document
Street Name
38TH ST
Street Number
2410
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEWLAND CONSTRUCTION COMPANY, I�VC. <br /> P.O. BOX 958 • 3300 CH ESTN UT• EVE� q�8206 •(206)259-9191 <br /> �� f7 ^.7 r•� r,-._ <br /> November 11, 1991 ` �� � ''� <br /> , ": <br /> ...............N�� 1 `� iggl �' ``�; <br /> CIT y..�F.......................... <br /> Bu ld ng Department /'uU�ic �vonV pR�TT <br /> 3200 C'edar <br /> �vereit, WA 98201 <br /> Attn: Mr. Ken Jackson <br /> RE: 33th Street Distribution Warehouses <br /> Permit #26033 <br /> Dear Ken: <br /> Due to z m�-up in communicati ,,we di�ln't implement special masonry inspection nor call for <br /> the City Building Department's inspectian :or the masonry work at the subject job. <br /> I discussed the matter with my job superintendent Floyd Pitman, and he verified that all resteel <br /> placement and grout pours were done per plan schedule. <br /> In addition, I employed the services of Cascade Testing Laboratory to perform Facometer tests <br /> on the hvo buildings. They verify the spacing of the bars in the masonry. <br /> I have enclosed for your reference, a copy of Cascade's report. Also enclosed are copies of the <br /> concrete slips for each group pour. <br /> I hope the enclosed information will suffice for receiving the final certificate of occupancy fcr <br /> the Project. <br /> Again, we apologize for the mix-up and will take measures to see that this doesn't happen again <br /> on any of our projects. <br /> If you have any qucstions or need additional information, please contact me at any time. <br /> Sincerely, <br /> NEWLAND COIISTRUCTION CO., INC. <br /> , � /: <br /> . �._ G�___-'� <br /> George S. Newland <br /> GSN/cl <br /> Enclosures <br /> 11/llLT <br />�^'�--�– <br /> � — <br />
The URL can be used to link to this page
Your browser does not support the video tag.