My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2410 38TH ST 2016-01-01 MF Import
>
Address Records
>
38TH ST
>
2410
>
2410 38TH ST 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2017 10:28:00 AM
Creation date
3/31/2017 10:27:38 AM
Metadata
Fields
Template:
Address Document
Street Name
38TH ST
Street Number
2410
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
{ <br /> . � /� � <br /> "������� � � � � � � �' � PUBLIC WORKS DEPARTMENT <br /> UTILITIES DIVISION <br /> COST ESTIMAZ'E SHEET �qN 10 iQ�� EVERETT, WASHINGTON S 98201 <br /> ..................................._...................._.. �206) 259-8800 <br /> keceipt � y�'G � z CITY OF EVERETT. Date Paid �'-G- 5/ <br /> Public Works Dept. <br /> x Cost of Work Order $ 2380. �'ork Order ,� <br /> Cost of Service Order $ Service Order # _ <br /> Contact Person: Telephone # <br /> Requested By: Gordon Date of Request 1-8-91 <br /> Property Owner (name) Hill Street investments <br /> Charge Cost to (name if different than owner) <br /> Address P.O. Box 5459 City Everett Zip 98206 <br /> Installation Location Smith & 38th <br /> Installation type/description/size/etc. Hot Tao Final Connection <br /> [x] The following estimate is based upon the Utilities Division <br /> providing all labor, equipment, materials, restoration, and f.inal <br /> hook-up. <br /> [ ] The following estimate is based upon the Street Division work group <br /> providing all labor, equipment, materials and restoration to <br /> property. <br /> Whenever the estimated cost is not eufficient to cover the total expenee for labor, <br /> material, equipment rental and administrative coste, the deficit shall be charged to <br /> the property for which euch installation was made a�d the owner thereof, and prov?ded <br /> further, that any exceso payment shall be returned to the person applying for the <br /> installation. <br /> Itemized Cost Estimate: <br /> LaboZ' & OveYhead 900. cc: Cheryl Fontaine <br /> Clair Olivers <br /> Dfaterial 1065 . 2om Thetford <br /> Don Weitkamp <br /> Equipment Rental 365. Kirk erooks <br /> Gordon Witcher <br /> Surface Restoration 50. o. oon wahi <br /> Dan Lowell <br /> Total S 2380. Stan Mitchell <br /> Prepared by Oliver Wahl �C _� C � <br /> Accepted by Representing <br />
The URL can be used to link to this page
Your browser does not support the video tag.