Laserfiche WebLink
� ,� <br /> PL/B�/� �V�/�KS <br /> �a''-=�;" <br /> June 19, 2003 <br /> Jack Shceler <br /> 8919 Eastview Avenue <br /> Everett, �l%A 98208 <br /> RE: Ovmer: Sheeler <br /> Job Address: 240Q 39'h Street <br /> Plan Check No: B030�-036 <br /> Dear NIr. Sheeler. I <br /> In response to your application for a construction permit, your plans have been examined and you are <br /> advised that the issuance of a permit is bein� withheld for the reasons listed below. These comments <br /> address building issues only. Additional revisions, or additiuns, may be required by other <br /> departmen�s (such as Utilities, Planning or Fire). All references refer to the 1997 Uniform Building <br /> Code, as amended by the State of Vb'ashington ancUor J✓ashingron State Ener�y Code, 2001 Edition, <br /> unless stated otherwise, <br /> In order for the pracessing ol'your npplication to continue, i.t will be necessary to provide the <br /> Building Division witli two complete new sets of drawings re[lecting the corrections requested. <br /> 1. As stated in the previous letter, the design bending moment for the posts cannot be WL�/g <br /> if there are no shear walls supporting thc roof diaphra�m. In other words, the po,ts <br /> would need to act as cantilevers fixed at the base subjected to a point load of FRF at me <br /> top and a uniforn wind load on the entire leroth. The design mcment would actually be <br /> [(FRF) (L) + (158) (L)"l2]12. Where FRr. _ (13.2) (6.6T (12). The resulhng desi�n <br /> moment (1E.33 K-FT.) would result in a bending stress to a raugh sawn 6 x 6 of 5.61 K5I <br /> which far exceeds the allowable. <br /> 2. The calculations will not be considered as part of the construction dacuments for this <br /> project. The revised connection detail must be clearly detailE:d in the Spane Building plan <br /> set. Include within the calculations a check of the 5/8" bolt t•o resist wind uplift. <br /> 3. The submitted revised calculations indicate usin� hem-fir select structural or DF �1 for <br /> the �irts. Based on F�,=1000 for DF #l, it would not compl}'. Species and grude must be <br /> indicated or. the construction documents. <br /> d. Species and grade for the pudins must be indicated on the construction documents. <br /> 5. Connection details must be included in the construc[ion documents (Spane Buildin�� plan <br /> set). Include the purlin to truss connection. <br /> � <br /> oEoirt��n�cn.�isrnuvueama;osms a:os;sn�sn�i /L <br /> CIT�- '��F E`IERETT• �200 Cadar Street • Everett. �VA 3E�01 • �3�5) 25-8200 • Fax (a25) _57-38�0 <br />