Laserfiche WebLink
9 <br /> CITY OF EVERETT <br /> FINAL CONTRACT VOUCHER CERTIFICATION <br /> CONTRACTOR: Road Runner Striping ADDRESS: 10611 Canyon Road E. #122 <br /> CITY: Puyallup STATE: WA 98373 DATE: August 14, 2008 <br /> PROJECT TITLE: 2008 Pavement Markings WORK ORDER NO. 3330 <br /> DATE WORK COMPLETE: August 8, 2008 FINAL AMOUNT: $ 49,898.20 <br /> CONTRACTOR'S CERTIFICATION <br /> I, the undersigned, having first been duly sworn, certify that the attached bill is a proper charge for work performed <br /> and material furnished to the City of Everett, that the same or any part thereof has not been paid, and that I am <br /> authorized to sign for the claimant; that I have not rented or purchased any equipment or materials from any <br /> employee of the City; I further certify that the attached final estimate is a true and correct statement showing all the <br /> monies due me from the City of Everett under this contract; that I have carefully examined said final estimate and <br /> understand the same and that I hereby release the City of Everett from any and all claims of whatsoever nature <br /> which 1 m ave, aris. out of the performance of said contract, which are not set forth in said estimate. <br /> X x Pres;,,,ie ``���ttiuIII/4 <br /> CONTRACTOR TITLE ���\ NET R. <br /> Road Runner StripingoMMiss•4%, <br /> '44 <br /> Subscribed and sworn tQ before = =N 2s Y <br /> me his 2 ay of Y� 2�r2 �• <br /> X 1� Z; Notary Public s�,.o� a '•', <br /> �� f �hUl 1\i �y 'wSHm� <br /> in d for the tate of Washington, residing at J //Vj� 'rr9;pUB ;�,``���` <br /> PUBLIC WORKS DEPARTMENT CERTIFICATION <br /> I Certify the attached final APPROVED Date: `I <br /> estimate to be based upon actual <br /> measurements and to be true and correct. <br /> X_>t ✓ X <br /> Construction Manager Utilities Director <br /> Tom Fuchs Tom Thetford <br /> INSTRUCTIONS <br /> The Affidavit of Wages Paid must be prepared by the prime contractor, all subcontractors, and all subcontractor's <br /> agents and forwarded with the Final Contract Voucher Certification. <br /> Contractor's Claims, if any, must be included and the Contractor's Certification must be labeled indicating a claim <br /> attached. <br /> Revised 9/94 <br /> 3 <br />