My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008/09/17 Council Agenda Packet
>
Council Agenda Packets
>
2008
>
2008/09/17 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2017 11:25:55 AM
Creation date
3/31/2017 11:25:26 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/17/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
" s "',PART;II .BUOGETr ` <br /> APPLICAt <br /> Name City of Everett Public Works Department <br /> SECTION A—Narrative Statement <br /> Include all information that the grant manager will need to draft the agreement, such as: see attached narrative statement. <br /> • Short history/background of the site <br /> • Consent decree or settlement agreement <br /> • Site's current status <br /> • Overview/summary of what remedial activities will be performed (the specifics will be addressed under the scope of work and <br /> tasks below) <br /> • Outcomes expected. <br /> • Any existing agreements with consultants that will be grant funded <br /> • Any existing scope of work approved by Ecology(Be specific; list out task headings and task details) <br /> • All pertinent budget information <br /> Attach additional sheets as necessary <br /> SECTION B —CALCULATION OF ECOLOGY GRANT <br /> (Note: requests checked in part 5A must be listed here. Land acquisition has an additional form.) <br /> Note: Please provide specific details for each task in order for the project to be evaluated for eligibility. <br /> REQUESTED ESTIMATED DATE OF <br /> TASK OR ITEM TOTAL PROJECT COST FROM ECOLOGY DELIVERY OR COMPLETION <br /> Provide details about the kinds <br /> of actions or activities and costs <br /> you wish to be considered for <br /> eligibility under the grant. <br /> You may provide the details in <br /> this column or add an <br /> attachment to your application. <br /> Examples: <br /> Task 1 RI/FS <br /> Includes contractor and recipient <br /> project management costs , <br /> needed to develop the RI/FS SEE ATTACH h,D <br /> scope of work, draft and Final RI <br /> report,draft and final FS report, <br /> selection of remedy, sampling <br /> and analysis,and development <br /> of the cleanup action plan. <br /> Task 2 Interim Actions <br /> This task includes source <br /> removal in 3 locations to <br /> address hotspots of <br /> contamination in the soil. Costs <br /> include those reasonably <br /> associated with removal and <br /> disposal of contaminated soil, <br /> confirmational sampling and <br /> analysis in the soil and <br /> groundwater. <br /> TOTALS <br /> 2 <br /> ECY 070-104 <br />
The URL can be used to link to this page
Your browser does not support the video tag.