My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
410 45TH ST SW 2016-01-01 MF Import
>
Address Records
>
45TH ST SW
>
410
>
410 45TH ST SW 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2017 12:55:45 PM
Creation date
3/31/2017 12:55:33 PM
Metadata
Fields
Template:
Address Document
Street Name
45TH ST SW
Street Number
410
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Meg Haley ���d���g <br /> From: Meg Haley <br /> Sent: Friday, June 24, 2011 9:29 AM <br /> To; 'Kate Mallahan' <br /> Subject: RE Martinell Tri-Plex corrections return eta <br /> Hi Kate, <br /> I would like thc opporWnity to revicv� the drai^,�ings that are resubmitted and then ansv�er questions...wc can ahvays <br /> handle a clariFication or revision by e-mail as needed. �Vould thai work tor you? The corrections letter induded a lot of <br /> comments about handrails. <br /> Meg <br /> From: Kate Mallahan �mailto:kateColoermittin4specialties.comj <br /> Sent: Thursday, ]une 23, 2011 9:41 PM <br /> To: Meg Haley <br /> Subjed: RE: Martinell Tri-Plex corrections return eta <br /> Hi Meg, <br /> Quick question for you regarding the exterior stairs servicing the second floor units - <br /> the engineer is showing the railing detail as built ��hich is not to code due to the date <br /> of the original construction. We were not planning on updating the railing but I wanted <br /> to run this by you prior to submitting our corrections response. Are we grandfathered in <br /> there? I have not seen the plans detailinE; those railings so I am not sure exactly �•�hat <br /> is not to cade - I am guessing the distance beCr:eeii spin�llc•s or cls�� the i�ailin6 <br /> extension beyond thc bottori trcad. <br /> Thanl<s, <br /> Kate <br /> ��Q���TINCSA <br /> F� <br /> > <br /> r <br /> N <br /> (� <br /> � <br /> Ka.ter Malla�la�v i <br /> d'_'S-d�l�l-I 93� <br /> ���c��.�icrniiitinc;p�ci�illics,��nn <br /> From: Meg Haley fmailto�MHalevCaci everett.wa.usl <br /> Sent: Wednesday, June 22, 2011 3:25 PM <br /> To: Kate Mallahan <br /> Subject: RE: Martinell Tri-Plex corrections return eta <br /> Hi Kate, <br /> I am not scheduled for vacation ou[side of the holiday, and would like to estimate a one week turnaround (hopefully at <br /> most-but it really depends on what is resubmitted). The electricol permit cannot be picked up until after the building <br /> permit is issued (which can't be issued until the Public Wcrks permit is ready to issue). This also would apply to any <br /> other r�quired permits. Hope that helps. <br /> hleg <br /> 1 <br /> -- --� . �, r-Y� _rn, �,'t '. <br /> . . . ,.. . ,1�. <br /> t <br />
The URL can be used to link to this page
Your browser does not support the video tag.