My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1111 47TH ST SE 2016-01-01 MF Import
>
Address Records
>
47TH ST SE
>
1111
>
1111 47TH ST SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2017 1:30:13 PM
Creation date
3/31/2017 1:29:25 PM
Metadata
Fields
Template:
Address Document
Street Name
47TH ST SE
Street Number
1111
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i: � a <br /> OTTO ROSENAU & ASSOCIA1�o, INC. 6747 M. L. KWG WAY SOUTH. SE4TfLE, WA 98118 725�A600 - <br /> CONSTRUCTION INSPL•'CTION RGPORT <br /> � <br /> PRQIEGT: 120 �verett PERMIT NUMBER: 23509 <br /> ADDRESS: 1111 47th Street 5.5. JOB NUMB[R qn-n44 <br /> INSPE"fOR � <br /> ANC ':ATE INSPEGTOR'S REMARKS <br /> - �_ <br /> D. Newman Visual verification of required nailing. Sliear caall ,`%6 on tl�� <br /> 5-22-90 West side, �orth end of i.iie Uuilding ��as inspected :<nd verifl. � <br /> � <br /> have been constructed as per plans and specificatio�is. �A <br /> . � <br /> D. Newnan Visual vcrification of che installation of straps. Sixty str � <br /> 5-24-90 tl�irty on each of the 4th and 3rd floors were locxted and ins�::i � <br /> according to plans and specifications. <br /> D. Newman On this date the site was visited for visual inspection of sr.rap and hold- <br /> 5-25-90 doc:n anchore. Installation of 30 straps on the second floor of Uuilding <br /> c�ao was verified as to location and meehod. Iuspection �:�as made of Lhe <br /> shear wall nailing prior to covering with dry�oall, on tlte North e�zd of the <br /> 4th floor of bui'_ding 1. St.eeting was nailed accoiding to nlans <br /> and specifications. Installaticr. of thirty HDSA hcld-down anchors was <br /> verified on the ]st floor of building 112. All 3/4" p rods were <br /> sockeCed and glued using specified methods and plan local'ions. <br /> I ,� ,. <br /> �� <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.