My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1111 47TH ST SE 2016-01-01 MF Import
>
Address Records
>
47TH ST SE
>
1111
>
1111 47TH ST SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2017 1:30:13 PM
Creation date
3/31/2017 1:29:25 PM
Metadata
Fields
Template:
Address Document
Street Name
47TH ST SE
Street Number
1111
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> PUBLIC F70RKS DEPARTIdENT <br /> UTILI'PIES DIVISION <br /> COST ESTIMATE SHEET 2300 CEDAR STREET <br /> EVERETT, WASHINGTJN 98201 <br /> (206) 259-8800 <br /> Receipt # !�ate Paid �—��V <br /> X Cost of Work Order $ 2800. 00 Work Order ,� <br /> Cost of Service Order $ Service Order # <br /> Requested By: Gordc� Date of Request 02-06-90 <br /> I <br /> Property owner (name) G � M Investment <br /> Charge Cost to (name if different than owner) I <br /> Address 57.0 Ranier Avenue S. City Seattle 2ip 98144 <br /> rn�tallation Location 47th Street .� Marvland Avenue <br /> Installation type/description/size/etc. Excavate. Make 8 " Hot tao on <br /> 28" main 6" Hot tap on 6" main. Make two final hooku�s and restore <br /> area. <br /> The following estimate is based upon the Utilities Division providinq <br /> all labor, equipment, materials, restoration and final hook-up. A <br /> double check valve assembl.y for temporary service is availa�le from the <br /> City's Permit Counter by requasting a Hydrant Use Permit with an <br /> aciditional deposit. <br /> Whenever the estimated cost is not sufficient to cover the total expense <br /> for labor, material , equipment rental and administrative costs, the <br /> deficit shall be charged to the property for which such install_ation was <br /> made and the owner thereof, and pr�vided further, that any excess <br /> payment shall be returned to the person applying for tne installation. <br /> Itemized Cost Estimate: <br /> Labor & Overhead 1120. 0o cc: Susy Haugen <br /> Clair Olivers <br /> Material 1200. 00 Tom Thetford <br /> Don �aeitkamp <br /> Equipment Rental 420. 0o Y.irk Brooks <br /> Gordon �9itcher <br /> Surface Restoration �0. 00 <br /> Service Order Cost , <br /> Total 2800. 00 <br /> Prepared by 0. �9ah1 ( /�� Revised 12/5/88 <br /> ��..�. <br />
The URL can be used to link to this page
Your browser does not support the video tag.