Laserfiche WebLink
A // <br /> • 1 I <br /> �. <br /> PUBLIC WORKS PERMIT COMMENTS <br /> 4. As per Public Works approved plan dated <br /> Q Connect side sewer per City Standard #601. <br /> 6. Connect side sewer per City Standard #'s 601, 602, 604. <br /> 7. Connect all rooftop downspouts to the side sewer. <br /> '8 Connect rooftop downspouts to the drainage system provided for this lot. <br /> 9. Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett <br /> Stortn Manual 3-2.6.2. Width_, Depth_, Length_ <br /> 10. The contractor must meet with the Public Works Inspector to discuss potential drainage <br /> routing prior to beginning the project. <br /> ✓11 Install erosion control measures as determined by the Public Works inspector, such as silt <br /> fence, straw bales, swales, or erosion blankets. <br /> 12. Install erosion control measures per City of Everett Standards for small parcels <br /> ( '13! Remove erosion control measures upon completion of the project prior to final approval of the <br /> �� permit. <br /> �. All excavated material from foundation, sidewalk and driveways shall be hauled to an <br /> approved, permitted site. No wasting of material is allowed on this building lot. <br /> 15. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan#'s 305A <br /> & 306 on this proposal's frontage as directed by the Public Works Inspector(i.e. all unused <br /> driveways and any broken or damaged area must be replaced). ' <br /> 16. Install a Type I concrete driveway per Cily of Everett Standard#307. <br /> 17. Pave driveway from the front property line out to the street paving. <br /> 18. Contact the Water District for connecting provisions for this building's <br /> water and sewer services. <br /> 19. A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan#410 is <br /> required for the parking area. <br /> 20. If a sewer pump system is to be installed, the pressure line must discharge into a private <br /> manhole, then gravity flow across the public right-of-way. <br /> 1 2U�A sprinkler system is required for this building in compliance with the requirements of NFDA <br /> `� Standards 13D. <br /> PWCommenis <br />