Laserfiche WebLink
INSPECTION REPORT <br />Date 10O. Permit. <br />Contractor: <br />J I Owner: <br />Site Address: 1 4o 1 <br />ELECTRICAL <br />❑ Temp Service <br />❑ Groundwork <br />❑ SlabrConduit <br />❑ Rough In <br />❑ Service <br />❑ Grounding <br />❑ Ceiling Grid <br />Electrical Final <br />SITE WORK <br />❑ Footing drains <br />❑ Roof drains <br />C(305 —c65 <br />TYPE OF INSPECTION REQUESTED <br />BUILDING <br />❑ UFER ground <br />❑ Footing <br />❑ Foundation <br />Sla <br />-fFStructural <br />6amin, -- <br />Ilationn <br />L] Drywall Nailing <br />❑ Shear Nailing <br />❑ Roof Nailing <br />❑ Ceiling Grid <br />❑ Building Final <br />OTHER OR CONSULTATION: <br />MECHANICAL <br />❑ Groundwork/Slab <br />�] Rough In <br />Ceiling Grid <br />❑ OK to insulate <br />jj Rooftop Units <br />Lj Mechanical Final <br />GAS PIPE <br />n Rough In/Service <br />❑ Rclrigeration <br />L] Gas Pipe Final <br />PLUMBING <br />❑ Groundwork/Slab <br />Rough In <br />❑ Ceiling Grid <br />❑ OK to insulate <br />❑ Water Service <br />❑ Medical Gas <br />Plumbing Final <br />Hot Water Tank <br />❑ Rough in <br />O HWT Final <br />Lj APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br />❑ OK FORT C.O ❑ CORRECTION REQUESTED <br />❑ OK FOR C 0. ❑ VIOLATION <br />r� UNABLE TO PERFORM INSPECTION: <br />CALL (425) 257-8881 FOR REINSPECTION — 24 hour notice required <br />Inspector: Date: <br />F.IR(10,06) <br />Z40 - 1-4 3 <br />DATABAR. INC. <br />