Laserfiche WebLink
. � � <br /> Mr. Shroyer (C0312-015 <br /> January 7, 2004 <br /> Page 2 <br /> 5. Show all footings on foundation plan per engineer's design, including posts at deck. <br /> Corrected on the foundation plan, page N5. <br /> 6. Show all foundation walls and retaining walls on foundation plan. Cross-reference all <br /> walls to engii:eering. <br /> Corrected on the foundation p[an, page k5. <br /> ✓7. Provide smoke detectors in all sleeping rooms and in the corridor or area giving aaess to <br /> each separate sleeping area. 310.0 UBC. <br /> Corrected on floor plans, pages li3 and k4. <br /> ��. Designate extent of heated space and unheated space. Provide insulated door between <br /> heated and unheated space. <br /> Corrected on lower floor plan, pnge N4. <br /> �4. Glue-laminated beam ar. wet bar to be 3 'h"x 11'/A" per e�gineering. <br /> Corrected on lowerfloorplan, page ll4. <br /> �'10. Show furred wal(s at all below grade heated spaces. <br /> Shown an page k4 and detail 6/page N8. <br /> �1. All lbotings shall rest on undisturbed soils not less than 18" below the tinished grade. <br /> Noted on foundatioi:plan, puge #S. <br /> �2. Provide rypical building sections as shown at "Section A" and "Section B" on plan <br /> views. Pages N 6 and I17. <br /> ✓13. Provide safety glazing at all hazardous locatiuns as defined in Section 2406 UBC. <br /> Noted on pages !t3 and N4. <br /> �'14. Provide minimum 36" landing at not more than 1" below the tinished floor where ' <br /> exterior doors swing out. <br /> Corrected on flaor plans, pages N3 and N4. Shown on E[ev. pages NI and <br /> 1/2. <br /> �15. Yrovide minimum 36" landing not more than 8" below the finished floor where e;:terior <br /> doors swing in and at sliding glass doors. <br /> Corrected on floor plans, pages #3 and #4. S{:own on Elev. pages #1 arid J12 <br /> '�16. Provide 110-volt smoke detector at high point of vaulted ceiling if more than 24" above <br /> ceiling in ha(l providing access to sleeping room(s). <br /> Corrected on upperJloor plan, page ff3. <br /> �17. Show how the beams at the southeast corner of the house are supported on the retaining <br /> wall. <br /> Corrected on the foundation plan, page N5. <br /> 18. Provide detail at deck connection showing how moisture barrier is maintained and <br /> flashing for protection of ledger. <br /> � <br /> DIiDI/I'INCKMSTH1111JLMANlCU11?-0IS IBU].IB°1 ST SNq <br />