Laserfiche WebLink
everett INSPECTION REPORT <br />eAddress —.� r AA S 0 <br />Contractors <br />Owner �� \ <br />Date <br />TYPE OF <br />INSPECTION REQUESTED <br />P. BLDG: PmL No. c�3.7 %`I ❑ MECH: Pmt. No. <br />❑ ELEC: Pmt. No. PLBG: Pmt. No. _ <br />❑ Temp. Elect. ❑ Framing ❑ Gas Piping <br />XFooting ❑ Drywall, Nailing O Consultation <br />/G Foundation ❑ Shear Nailing ❑ Groundwork <br />❑ Ductwork ❑ Grid ❑ Struct. Slab <br />❑ Wood Stove ❑ Rough -In --G-Final <br />LJ Masonry ❑ Service G _' <br />❑ APPROVAL ❑ PARTIAL APPROVAL <br />1-1VIOLATI N— CORRECTION REOED <br />rections listed b low MUST ADE befor rk-cam: approved. <br />Please contact insprtor and arrange or appointment. <br />Was not able to perform inspection. <br />CALL 259.8833�-FOR REINSPECTION — 24 hour notice required. <br />CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br />ERTI <br />4 <br />ISES PRIG <br />R TO OCCUPANCY. _ ^ <br />