Laserfiche WebLink
CLOSED CM WOAR ORD8R8 RBP�RT <br /> Total Utility Maintenance Management System paqe 1 <br /> 04/23/1997 <br /> -�__________________�________�___ <br /> ____�__:�_���__�________�_��______________ <br /> Date Range :O1/09/1989 - 04/08/1997 <br /> CM Work Order Range :1001091070001 - 7401196770910Pattern :*101236710099 <br /> Item Ranga :<Blank> - F1VL3694L05 <br /> Program ALL Function ALL Activity ALL <br /> �_�:_��:���==�=�s___________________________ <br /> _______________________�_ <br /> CM WORK ORDER ID: 7101236710099 Title: REPAIR 932 - 49TH PLACE S.W. <br /> «DUPLICATE PRINTING OF THIS WORK ORDER» <br /> Item ID: DCB3694U07 -- CATCH BASIN <br /> Location ID: -- Activit 671 <br /> Program 710 Function 123 Y <br /> Date Completed: 04/07/1997 <br /> Overall CraPt: <br /> Issued: 02/25/1997 Issued by: HDA Assigneci to: AGA <br /> Out of Service? NO Priority: Travel Time: 0.00 Hr. <br /> Meter Readinq: <br /> Downtime: 0 hours <br /> Status: HN <br /> € <br /> � Labor: <br /> E Craft ID Name Planned Ars Actual Hrs __ Cost___ <br /> r ---- ---------- ---------- <br /> ------------- ----------- - <br /> i UL GCR GRENZNER, CHRIS R. 0.00 10.80 168.26 <br /> � UL GDJ GOSS, DANNY JAMES 0.00 10.00 141.30 <br /> � SUP2 HDA HALLSSON, DONALD A. 0.00 9.00 ____230_04 <br /> � Total Labor Cost: 539.60 <br /> s' <br /> � <br /> Materiala: Date # Used Cost <br /> ZD Description __________ <br /> ---------------------- <br /> -------- -------- -------- <br /> s __-----_____ 11.85 <br /> } CEME00061438 CEMENT 20 MIN. SET 50 LB. BAG 04/08/1997 1 <br /> Total Material Cost: 11 85 <br /> ; p�hiclse: Hours Cost <br /> Ip Description <br /> ' ---------- ------ ------ <br /> � ------------ -------------------- <br /> V2053 '86 CAEV 1/T PU 3 .00 14.40 <br /> � V2137 84 GMC BOOM TRUCK 5 TON 10.00 212 . 00 <br /> VH0002 1993 VACTOR 7.80 404 .82 <br /> VJ0019 '96 FORD 1 TON 6.00 _____35_40 <br /> Total Vehicle Cost: 666.62 <br /> Work Description: -------------- <br /> ---------------------------- <br /> ---------------------------------- <br /> CHANGE OUT EXISTING RESTRICTOR WITH A NEW ONE THAT HAS DIFFERENT OVERFLOW/ <br /> OPERATING ELEVATIONS. <br /> Total cost for work order 7101236710099: <br /> 1218.07 <br />