Laserfiche WebLink
City of Everett <br />Building Division <br />Area and Fee Calculations <br />For Structures Over 2500 S.F. <br />Plan Check No. l D 10 5 -- C l <br />AREA <br />219 3 I (o(0 53� <br />Main Floor ' -i-� _SQ. FT. @ $75.94 / S.F. _ $ <br />Upper Floor 1 '7 Z -r Q. FT. @ $75.94 / S.F. _ $ 1 91 , 14s3 <br />Lower Floor SQ. FT. @ $75.94 / S.F. _ $ <br />Garage I G 1,51 SQ. FT. @ $19.90 / S.F. _ $ 3 S 183 <br />Deck %29 SQ. FT. @ $15.00 / S.F. _ $ I l 3 t35 <br />Other 31 SQ. FT. @ $ I8,4 0 / S.F. _ $ SSf3 <br />TOTAL $ 347.84s <br />Total conditioned Space 39 20 51F <br />Glazing <br />Main Floor <br />Upper Floor <br />Lower Floor <br />54+- (- SQ.FT. <br />ZoY.ZS SQ.FT. <br />SQ.FT. <br />Total % 48, BSSQ.FT. I q qr, <br />