My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2908 49TH ST SW 2016-01-01 MF Import
>
Address Records
>
49TH ST SW
>
2908
>
2908 49TH ST SW 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2017 5:28:24 PM
Creation date
3/31/2017 2:59:56 PM
Metadata
Fields
Template:
Address Document
Street Name
49TH ST SW
Street Number
2908
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />� E!/E/c ETT <br />PUBLIC WORKS PERMIT <br />City of Everett Pupfio Works DepBrirt,lerlt1fj��,�Ep� <br />3200 Ued`aF,Street �,�r-i <br />Everett, WA 98201 <br />(425)�� 257!-88j 0� uliniL` <br />Date: 10/19/2010 <br />Public Works Permit#: PW1010-015 <br />14: �`� guildinq Permit #; C1010-015 <br />�,�'a44J � <br />�Ia2ninq Reference #: <br />Public Works Fee $: $ 25.00 <br />; ' ��r;, 31,67ti.11 other 3: <br />OWNER NAME AND ADDRESS: ; Lhi� APPL � II�NAME AND ADDRESS: <br />JU.I!U <br />MUSTACH LAND DEV, LLC i URIVE y��,,.pi <br />PO BOX 12176 � � C ;�y•50 <br />1.11�1�.�<1 <br />MILL CREEK WA 98082 1 c�f�EF� t"fi v0 <br />PHONE: 4252440549 1 SV� ��;i PH�I�r�,�� <br />TAX PARCEL ID p 29043400406100 1�-', t'� �J�YdD[��SS: 2908 49TH ST SW 90203 <br />DESCRIPTION OF PROPOSED WORK: r�'^�� :�.';•_4;�,hi <br />NEW HOUSE <br />ra ����riNc�110 �i <br />PERMIT CONDITIONS <br />1. All calls for inspection shall be made 24 hours in advance. <br />2. All wnrk shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br />and Specifications. <br />3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br />4. Connect side sewer per City Standard #'s 601, 602, 604. <br />5. Connect rooftop downspouts to the drainage system provided for this lot. <br />6. The contractor must meet with the Public Works Inspector (cail Randy Allen at 425-339-7403) to discuss potential � <br />drainage routing prior to beginning the project. �,,,� <br />7. Install erosion control measures as determined by the Public Works inspector, such as silt fence, straw bales, � <br />swales, or erosion blankets. � <br />8. Remove erosion control measures upon completion of the project prior to final approval of the permit. <br />9. All excavated materiai from foundation, sidewalk and driveways shail be hauled to an appro �ed, permitted site. Q <br />No wasting of materiai is allowed on this building lot. � <br />10. No dirt, mud, rocks or debris to be tracked onto roadway. z <br />11. No building materiais to be stacked on sidewalklroadway and sidewalb'roadway to be kept clean and open for O <br />pedestrian travel. <br />12. Adjust water meter box 1" above sidewalk grade. E"� <br />13. Remove and repiace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A 8 306 on this V� <br />proposal's frontage as directed by the Public Works Inspector (i.e. all unused driveways and any broken or (7 <br />damaged area must be replaced). a <br />14. Install a Type I concrete driveway per City of Everett Standard #307. <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owr�er/applicant hereby agrees to hold and <br />save harmless lhe City ot Evarett from any and all claims for <br />damages, costs, expenses, or causes of action that may arise <br />because ot installation and maintenance ot the improvement <br />or other right-ot-way use hereto applied for and furiher agrees <br />to remove same upon notice from the City and lo replace <br />public pr"a/peAy dama ihereby. / <br />��g ,��'� % � �� � <br />f� rrK� / � ;;�4Y1�/ % ��_=�`1��� <br />� <br />Signature of Applicant Date <br />WORK AUTHORIZED BY THIS PERMR MUSf BE STARTED WITHIN 180 DAYS OF DATE PERMR IS ISSUED AND THEREAFfER IS TO BE DILIGENTLY <br />PURSUED TO COMPLEf10N. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY SfOPPAGE OF WORK ON THIS PROIECT OVER 90 DAYS DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.