Laserfiche WebLink
� <br />E E• TT <br />PUBLIC WORKS PERMIT <br />City of EvereK Public Works Department <br />3200 Cedar Street <br />Everett, WA 98201 <br />(425) 257-6810 <br />Date: 8/3/2010 <br />Public Wc�rks Permit #: PW1008-005 <br />Buildinq Permit#; C1008-001 <br />Planninq Reference #: <br />Public Works Fee $: $ 25.00 <br />Other $: <br />OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br />MUSTACH LAND DEV LLC <br />PO BOX 12176 <br />MILL CREEK Wq 98082 <br />PHONE: 4252440549 PHONE: <br />TAX PARCEL ID # 2904340040570 SITE ADDRESS: 2524 49TH ST SW <br />DESCRIPTION OF PROPOSED WORK: <br />NEW HOUSE - BASIC 401 <br />PERMIT CONDITIONS <br />1. Ail c�Ils for inspection shall be made 24 hours in advance. <br />2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br />and Specifications. <br />3. Call Locatir,n Underground Service 48 hrs before you dig. TOLL FREE NUMBER 817 � <br />4. Connect side sewer per City Standard #'s 601, 602, 604. <br />5. Connect rooftop downspouts to the drainage system provided for this lot. <br />6. The contractor must meet with the Public Works Inspector (call Randy AIIen at 425-339-7403) to discuss potential <br />drainage routing prior to beginning the project. <br />7. Install erosion control measures as determined by the Public Works inspector, such as silt fence, straw bales, <br />swales, or erosion blankets. <br />8. Remove erosion control measures upon compietion of the project prior to final approval of the permit. <br />9. All excavated material from foundation, sidewalk and driveways shall be hauled to an approved, permitted site. <br />No wasting of material is aliowed on this building lot. <br />10. No dirt, mud, rocks or debris to be tracked onto roadway. <br />11. No building materials to be stacked on sidewalk/roadway and sidewaik/roadway to be kept clean and open for <br />pedestrian travel. <br />12. Adjust water meter box 1" abo•ee sid� walk grade. <br />13. Remove and replace curb, gutter anr, sidewalk as per City of Everett Standard Plan #'s 305A 8 306 on this <br />proposal's frontage as directed by the Public Works Inspector (i.e. all unused driveways and any broken or <br />damaged area must be replaced). <br />14. Install a Type I concrete driveway per City of Everett Standard #307. <br />, L�-��-�� <br />`�lr �% .+i�'tr-�� � '�� �O <br />Approve'8�dr Constr sticn .. Daie <br />�(<�.� -(_�- .11� 2 •- z � - / I <br />FINAL INSP TION Date <br />Approved as Constructed <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/applicant hereby agrees to hold and <br />save harmiess ihe City of Everett from any and all claims tor <br />damages, costs, expenses, or causes of action that may arise <br />because of installation and maintenance of ihe improvement <br />or olher right-of-way use hereto appiied for and furiher agrees <br />�o remove same upon notice from the City and lo replace <br />public pro erty damaged thereby. <br />! /CJ <br />Signy ure of Applic nt Date <br />WORK AUTHORIZED BY THIS PERMR MUST BE STARTED WIfHIN 1G0 DAYS OF DATE PERMif IS ISSUED AND THEREAFfER IS TO BE DILIGENTLY <br />PURSUED TO COMPLEf10N. THIS PERMR MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROIECT OVER 90 DAYS DURATION. <br />/ <br />