Laserfiche WebLink
i <br />� � <br />;� HALL KIENAST ARCHITECTS <br />i <br />'� <br />I,� <br />� ��i.r. i9s� <br />Randy Turner, AIA <br />Area Architect - <br />LDS Physical Facilities Department <br />3295 Elder Street, Suite 350 <br />Boise, ID 83705 <br />Re: LDS Meetinahouse Remodel <br />110 W. SOth Street <br />Everett, WA <br />Project No. 502-4730-75 <br />Dear Randy: <br />�v <br />����D�I�� <br />MAY 2 0 �qe�� <br />EVERETT BUILDING DEPT. <br />Robert Nall <br />Gary Kienast <br />� We appreciate this opportunity to assist the Church of Jesus Christ of Latter-Day <br />,� Saints with this challenging project. <br />' Since reviewing the existing facilities with .you un the 6th of May, we have made a <br />� number of mare detailed surve.ys of the building and the project site. We have also <br />I� involved the following consultants during this preliminary phase and have included <br />, their assesments in this report: <br />CI <br />� <br />Mechanical/Electrical: <br />Acoustical: <br />Asbestos Abatement: <br />Cost Estimating: <br />AER Engineers, Seattle <br />Towne, Richards & Chaudiere, Inc. Seattle <br />Certified Industrial Hygiene Services, Inc. <br />Seattle <br />Constructioneering, Bellevue <br />The main improvements which we feel are needed to bring the building uo to current <br />LDS standards and to provide a reasonable level of comfort and convenience for its <br />users can be sumnarized as follows: <br />Replacement of practically �he entire heating and ventilating system. <br />New pitched roofs over existing flat-roofed areas to allow for insulation and <br />new ductwork. <br />Replacement nf curtain-wall system with new double-glazed windnws and insulated <br />panels. <br />Extensive remodelling of Chapel and Cultural Hall. <br />5,-e, % �.a�.e, ��%a�-�% <br />�106 South Pine Street, Box 521. Burlington, Woshingion 98233 <br />207'/: Firsf Avenue South, Sui}e 200. Seatile, Washingfon 98104 <br />�� <br />(206) 755-0898 <br />(20b) 622•6235 <br />