My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1002 51ST PL SW 2016-01-01 MF Import
>
Address Records
>
51ST PL SW
>
1002
>
1002 51ST PL SW 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2017 2:31:36 PM
Creation date
3/31/2017 3:19:52 PM
Metadata
Fields
Template:
Address Document
Street Name
51ST PL SW
Street Number
1002
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COMPLIANCE NWEC LOWRISE RESIDIENTIAL COMPLIANCE CHECKLIST <br />heated dwellings, s 3 stories, Zone Z <br />INSPECTION <br />APPROVED IMPORTANT: Plaase supply Informatlon requeated In the approprlate <br />ahaded boxea below. Dlsrepard boxes thet don't describe your bulldinp or <br />equlpment. �Iplace checka In the two left column�. <br />INSULATl�N PHASE <br />Walla(Includinp r(m �olsta) will be insulated without compresalon to: .y 3. �• <br />❑ R-19 batt (Chil6, options I,III,IV) ❑ R-24 (Ch #6,Option II) � R-�3 (Ch # 4 or 5) <br />Balorr p rade wel Is not insulated on the exterior (See FOUNDATION PHASE) will be insulated to: <br />_ ❑ R-19(Chapter 8, all Options) on the Interior ❑ R-_ (Chapters 4, 5, or 7) on the interior. <br />Vaultad cslllnps will be insulated wfthout mpressbn to: S� i:s a2- <br />❑ R38(Ch �i6, all optlons) � R �Ch #4 or 5) <br />U well Insuletlon is installed and equivalem to the required wall R-values <br />(Recommendat(on: place ceiling Insulation batts in place behind skylight weils) <br />Vapor retarders wlll be installed toward the wartn suAace as represemed below: <br />Select one o tion tor floors, walls, and approp►late celllnps: <br />Floors: � Plywood labeled EXPOSURE 1❑ Poly (a 4 Mil) ❑ backed batts ❑ PVA <br />Wails: ❑ Poly plastic (2 4 Mtl) ❑ backed batts ❑ PVA <br />Ceilings: ❑ Not required where ventilaHon space averages >12" above insulation. <br />❑RdK plutic ( 4 IAq ❑ back�d bath �] PVA <br />O liaatlnp system afflclency and alzlnp requirements will be met as represemed below: <br />Maximum heat(ng system capaclty (150%of design heat load) has been calculated at �� � KW <br />H�at Pump etflclency will be met underthe (ollowing compliance path: <br />❑ Ch �i6, Option IV: air source heat pump: HSPF 2 6.8 <br />❑ Ch ri5 air source heat pump: HSPF z 6.8, COP z 2.7/2.0 <br />❑ Ch #5 water source heat pump: COPZ 3.0 <br />Heatlnp system requlrements wlll is met wlth followlnp system: <br />Mfr. Model M Mez. output K W <br />Type HSPF COP <br />NWEC Insulatlon phase re�qulrements: <br />Approved by• <br />Dete <br />WEEB APRIL i0 <br />Page 8 Of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.