Laserfiche WebLink
everett <br />e <br />INSPECTION REPORT <br />Address �a Z� � � � �� �/�{ � <br />Contractor a12�f�� <br />Owner _ ����[� <br />Date _ �� � c�� <br />TYPEOFINSPECTION REQUESTED <br />❑ BLDG: PmL Na. � � ❑ MECH: PmL P.o. _ <br />❑ ELEC: PmL No. ❑ PLBG: PmL No. _ <br />Temp. Elect. ❑ Framing ❑ Gas Piping <br />Footing ❑ Drywall, Nailing ❑ Consultation <br />❑ oundation ❑ Shear Nailing ❑ Groundwork <br />❑ Ductwork ❑ Grid ❑ Struct. Slab <br />❑ Wood Stove ❑ Rough-In ❑ Final <br />❑ Masonry ❑ Service ❑ <br />❑ APPROVAL ❑ PARTIAL APPROVAL <br />❑ VIOLATION f� CORRECTION REQUIRED <br />❑ Corrections listed below MUST BE MADE before work can be approved. <br />❑ Please contact inspector and arrange tor appointment. <br />❑ Was not able to perform inspection. <br />(HCCALL 259•8810 FOR REINSPECTION — 24 hour notice required. <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br />THE PREMISES PRIOR TO QCCUPANCY. <br />Inspector <br />e v /4t'�'� <br />�, <br />