Laserfiche WebLink
everett <br />� <br />INSPE�TlON REPORT <br />Address <br />�rc � J��s �,S-f- Su� <br />Contractor <br />I f On f� 1� rr� <br />� <br />pwner <br />r z ,4 9 — <br />Date � <br />TYPE OF INSPECTION REQUESTED <br />❑ BLDG: Pmt. No. ------� MECH: Pmt. Na. �---- <br />� PLBG: PmL No. � — <br />❑ ELEC: PmL No. �� ❑ Gas Piping ��7� <br />❑ Temp. Elect. ❑ Framing p �onsultation <br />❑ Footing � Drywall, Nailing � Groundwork <br />❑ Foundation ❑ Shear Nailing p Struct. Slab <br />❑ Ductwork ❑ Grid ❑ Final <br />❑ Wood Stove �Rough-In � —_ <br />❑ Masonry ❑ Service <br />❑ APPROVAL ❑ PARTIAL aPPROVAL <br />❑ VIOLATION � <br />ORRECTION REQUIRED <br />❑ Corrections listed below MUST BE MADE before work can be approved. <br />❑ Please contact inspector and arrange tor appointment. <br />❑ as not able to perform inspection. <br />�..6ALL 259-8810 FOR REINSPECTION — 24 hour notice required. <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br />THE PREMISES PRIOR TO OCCUPANCY. — <br />L / <br />Inspector <br />s -'� �F9' <br />