Laserfiche WebLink
5 <br />CLOSED C!I WORR ORDSRS REPORT <br />Total Utility Maintenance Manaqement System <br />04/29/1996 Page 1 <br />Date Range :O1/09/1989 - 04/il/1996 <br />CM Work C�rder Range :1001091070001 - UT1002- - Pattern :7101236730100 <br />Item Range :<Blank> -- WP122020001 Pattern :* <br />Program ALL Function ALL Activity ALL <br />=_==__ =____ =_-__=________---------------- =-------------------- <br />CM WORK ORDER ID: 7101236730100 Title: INSTALL 610 - 51ST STi�4' S.W. <br />«DUPLICATE PRINTING OF THIS WORK ORDER» <br />Item ID: -- <br />Location ID: -- <br />Proqram 710 Function 123 Activity 673 <br />Date Completed: 04!0&/1996 <br />Overall Craft: <br />Issued: 03/28/1996 <br />out of Service? WO <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />I,ebor: <br />Craft ID <br />HEO AAL <br />SUP1 AGA <br />EO MJL2 <br />UL NCR <br />EO SR <br />Materials: <br />ID <br />CEME00061438 <br />COUP50300447 <br />N/A <br />N/A <br />PIPE50304547 <br />Vehicles: <br />ID <br />V2085 <br />V2111 <br />V2230 <br />V3507 <br />VJ0004 <br />Name <br />Issued by: HDA Assigned to: <br />Priority: Travel Time: 0.00 Hr. <br />ARNOLD, ARTHUR L <br />AIiLES, GREGORY A. <br />2�SITCHELL, JEFFREY L. <br />NIETHAMER, CHARLES R. <br />SIERRA. RAMON (NMI) <br />Planned Hrs <br />Description <br />------------------------------ <br />CEMENT 20 MIN. SET 50 LB. BAG <br />COUPLING 12" CONC X 12" Cl/PL <br />CB 15/RISER (ASSOC) <br />TOP COARSE (ASSOC) <br />PIPE 12" PVC SEWER <br />Description <br />91 GMC PU 4x4 <br />92 CHEV 1-TON <br />91 FORD F800 DUMP 5 <br />88 CASE BACKHOE 4X4 <br />�95 CHEV 1-TON <br />YARD <br />0.00 <br />O.OQ <br />0.00 <br />0.00 <br />0.00 <br />Actual Hrs <br />20.00 <br />4.00 <br />14.00 <br />16.00 <br />20.00 <br />Total Labor Cost: <br />Cost <br />379.60 <br />85.36 <br />257.32 <br />224.32 <br />367.60 <br />1314.20 <br />Date # Used Cost <br />-------- -------- ---------- <br />04/02/1996 3 33.93 <br />04/02/1996_____.__?----- 29.30 . <br />04/03/1996 1 ��36.42 <br />04/08/1996 1___� 66.96._. <br />04/02/1996 4 21.16 <br />Total Material Cost: 187.77 <br />1 <br />��J �`;i7 <br />Hours Cost <br />4.00 <br />12.00 <br />12.00 <br />12.00 <br />6.00 <br />Total Vehicle Cost: <br />-----22.24 <br />67.20 <br />136.80 <br />513.60 <br />36.60 <br />776.44 <br />