Laserfiche WebLink
� � <br />Plan Check No. 41019 <br />June 23, 1993 <br />Page Two of Two <br />, -. <br />� <br />In order for the processing of your application to co�.tinue, it will be necessary to provide the <br />' Building Division with two complete new sets of drawings reflecting the correcrions requested. <br />� Upon resubmittal of the drawings, your applica6on will be given priority and plan review <br />! recommence. <br />A;1 require� submittals shall be of sufficient detail and contain sufficient information to ensure <br />that the proposed shucture will be constructed in compliance with all adopted codes. <br />Sincerely, <br />Jeff Heilman <br />Development Technician <br />ix:�ypt.atp <br />n <br />:! <br />� <br />