Laserfiche WebLink
� <br />CIASED CM WORK ORDERS REPORT <br />Total Utility Maintenance Management System <br />08/23/1994 Page 1 <br />__ =_�----------= ----------•-----•-------- ------- <br />----- — -------------------------_-------______________________________ <br />Date Range :08/O1/1992 - OS/17/1994 <br />CM Work Order Ranqe :<Blank> - 8405421080229 Pattern :7401196750943 <br />Item Range :<Blank> - WW22020001 Pattern :* <br />Program ALL Function ALL Activity ALL <br />--------------� ------------------------------ <br />-------- - -- --------------------------------- ------------------------- <br />-------------------------- <br />CM WORK ORDER ID: 7401196750943 Title: CONVERT 3112 52ND PL SW <br />«DUPLICATE PRINTING OF THIS WORK ORDER» <br />Item ID: WS0384A009 -- WATER SERVICE <br />Location ID: -- <br />Program 740 Function 119 Activity 675 <br />Date Completed: 08/02/1954 <br />Overall Craft: <br />Issued: 07/12/1994 <br />Out of Service? NO <br />Meter Readinq: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft 1D Name <br />----- ------ ---- <br />UL NSO <br />UL TDE1 <br />Materials: <br />ID <br />ADAP34000347 <br />ADAP34000547 <br />ADAP34000647 <br />ADAP34145347 <br />BOX000056247 <br />ELIA34104247 <br />PIPE3406U647 <br />VALV34008648 <br />Vehicles: <br />ID <br />V2139 <br />V2139 <br />Issued by: SKL Assigned to: <br />Priority: Travel Time: 0.00 Hr. <br />NIEISEN� SCOTT O. <br />THOMPSON, DWAYNE E. <br />Description <br />-- --------------------- <br />ADAPTER 3/4" CST X INSTA-TITE@ <br />ADAPTER 3/4" MIP X INSTA-TITE@ <br />ADAPTER 3/4" FIP X INSTA-TITE@ <br />ADAPTER 3/4"MIP X 1"IPS INSTA@ <br />BOX METER PLA 15" X 10" W/LID <br />ELL 3/4" STREET SRASS ' <br />PIPE 3/4" POLY I.P,S. <br />VALVE METR 3/4" L/W FI�ARD COP@ <br />Description <br />SVC TRUCK CHEV 86 <br />SVC TRUCK CHEV 86 <br />Planned Hrs Actual Ars <br />0.00 6.00 <br />0.00 6.00 <br />Total Labor Cost: <br />Date <br />08/03/1994 <br />OS/03/1994 <br />08/03/1994 <br />OS/03/1994 <br />08/03/1994 <br />08/03/1994 <br />08/03/1994 <br />08/03/1994 <br /># used <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />3 <br />2 <br />Total Material Cost: <br />Date Hours <br />08/02/1994 3.00 <br />08/03/1994 3.00 <br />Total Vehicle Cost: <br />Work Description: <br />-------------------------------------------------------------------- <br />METER �39018089 <br />3/4 COPPER OUR SIDE. 1" POLY CUSTOMER SIDE. <br />Cost <br />87.36 <br />86.10 <br />173.46 <br />Cost <br />15.02 <br />7.48 <br />6.84 <br />9.90 <br />12.53 <br />1.56 <br />0.72 <br />18.76 <br />72.81 <br />Cost <br />15.30 <br />15.30 <br />30.60 <br />�; <br />