Laserfiche WebLink
� <br />�• T <br />PUBLIC WORKS PERMIT <br />City of Everett Public Works Department <br />3200 Cedar Street <br />Everett, WA 982Q1 <br />(425) 257-8810 <br />Date: 07/13/2011 <br />Public Works Permit #: PW1107-005 <br />Buildinq Permit#; C1105-014 <br />Planning Reference #: <br />Public Works Fee $: $ 25.00 <br />OthP,f $: <br />OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br />WANNAMAKER JEFFREY J & <br />3��1ND PL SW <br />EVERETT WA 98203 <br />PHONE: 2068515184 PHONE: <br />TAX PARCEL ID # 00396700301400 SITE ADDRESS: 3228 52ND PL SW <br />DESCRIPTION OF PROPOSED WORK: <br />GARAGE ADDN WITH BEDROOM <br />PERMIT CONDITIONS <br />1. All calls for inspection shall be made 24 hours in advance. <br />2. AII work shall be performed in accordance witY� the permit and current City of EvereYi Design and Construction Standards <br />and Specifications. <br />3. Call :.ocation Underground Service 48 hrs before you dig. TOIi FREE NUMBER 811 � <br />4. Connect rooftop downspouts to the drainage system provided for this lot. ��, �, „ <br />5. Please call your Public VJorks Inspector (Randy Allen 425-339-7403) to discuss drainage routin�prior to <br />beginning the project. n r"`r' �� <br />� cs�'c�-� <br />6. No dirt, mud, rocks or debris :o be tracked onto roadway. d m <br />TO POSTiNG � � � � ` � <br />� %�a� �-��- i/ <br />Ap ve for nstruc Date <br />�n 4 - Js- 4- <br />INAL INSP TION Date <br />Approved as Constructed <br />c� <br />� <br />r <br />ACKNOWLEDGEMFNT OF CONDITIONS <br />The undersigned owner/applicant hereby agrees to hotd and <br />save harmless ihe Cily of Everett from nny and all claims for <br />damages, costs, expenses, or causes of action that may arise <br />be�zuse of inslallation and maintenance o( the improvement <br />or other right-oi-way use hereto applied for and further agrees <br />to remove sam on notice from lhe City and to replace • <br />publi ert aged thereby. <br />� z� <br />Signatur tApplicant D te <br />WORK AUTHORIZED BY THIS PERMif MUSi BE SiARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br />PURSUED TO COMPLEl70N. THIS PEia•i� MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PRO)EC7' OVER 90 DAYS DURATION. <br />