Laserfiche WebLink
Ltr. D. Schwab G <br />September 18, 2001 <br />Page 3 <br />C <br />Upon resubmittal of the drawings, your application will be given priority and plan review <br />will recommence. <br />All required submittals shall be of sufficient detail and contain sufficient information to <br />ensure that the proposed structure will be constructed in compliar,ce with all adopted <br />codes. <br />Sincerely, <br />�� �� <br />Jeff Heilman <br />Development Technician <br />DEDIIPLNCKMSIR/NEILMAN/C010l�WW77_'LS_"° PL S WI � <br />