My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5900 52ND ST SE LINE 5 CROSS VALLEY WD 2016-01-01 MF Import
>
Address Records
>
52ND ST SE
>
5900
>
LINE 5 CROSS VALLEY WD
>
5900 52ND ST SE LINE 5 CROSS VALLEY WD 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2017 9:22:42 AM
Creation date
3/31/2017 4:08:07 PM
Metadata
Fields
Template:
Address Document
Street Name
52ND ST SE
Street Number
5900
Tenant Name
LINE 5 CROSS VALLEY WD
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br />CL03SD Cbi �PORR ORDBRS REPORT <br />Total Utility Maintenarice Management Svatem <br />09/24/1998 Page 1 <br />-----__________________________________________________________________=________ <br />Date Range :06/24/1900 - 09/24/1998 <br />CM Work Order Range :0810800810001 - UT2830-30-322Pattern :5201186760007 <br />Item Range :<IIlank> - W1Z3694L05 Pattern :* <br />Program ALL Function ALL Activity ALL <br />CM WORK ORDER ID 5201186760007 T��tle REPLACE <br />«DUPLICATE PRINTING OF THIS WORK 0:�2DLR» <br />Item ID: TS0;855013 -- TRANSMISSION SERVICE <br />Location ID: -- <br />Program 520 Funczion :L18 <br />Date Completed: 09/02/1998 <br />Overall Craft: <br />Issued: 08/10/1998 <br />Out of Service? NO <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft ID Name <br />60TH ST SE <br />Activity 676 <br />Issued by: RJW Assigned to: GJ <br />Priority: Travel Time: 0.00 Hr. <br />----- ------ ------------------------------ <br />UL MWE MOORE, WARREN E. <br />WST NSO NIELSEN, SCOTT O. <br />SUP I OBJ O'LEARY, BRIAN J. <br />Materiale: <br />ID <br />ADAP42031547 <br />METE42147447 <br />N/A <br />PIPE42055247 <br />Vehiclee: <br />ID <br />V2085 <br />V2151 <br />VJ0010 <br />Descri�,tion <br />ADAPTER 4" FLANGED ADAPTER DI <br />METER 4" NEPTUNE PROTECTUS 111 <br />4" FLANCc KIT <br />PIPE 4" TYTON JOINT DI <br />Description <br />- ------------- <br />91 GMC PU 4x4 <br />86 CHEV 1 TON HYD. UNIT <br />95 INTERNATIONAL BOOM TRUCK <br />Planned Hrs <br />0.00 <br />0.00 <br />0.00 <br />Actual Hrs <br />13.00 <br />13.00 <br />6.00 <br />Cost <br />212.42 <br />270.01 <br />123.72 <br />Total Labor Cost: 606.15 <br />Date # Used Cost <br />-------- -------- ---------- <br />09/03/1998 2 56.72 <br />09/02/1998 1 5173.15 <br />09/02/1998 2 �.2A <br />09/03/1998 4 25.44 <br />Total Material Cost: <br />Hours ___Cost___ <br />5.00 26.00 <br />13.00 72.80 <br />8.00 372.80 <br />Total Vehicle Cost: 471.60 <br />5262.59 <br />_ 7•�g <br />•��65.31 <br />Work Description: <br />-------------------------------------------------------------------------------- <br />REPLACE WITH 4" PROTECTUS METER-SWANS TRAIL. NOW CROSS VALLEY <br />
The URL can be used to link to this page
Your browser does not support the video tag.