Laserfiche WebLink
'Benyam Stephanos <br />� <br />From: Steve Ingalsbe <br />Sent: 7uesday, November 14, 2006 9:41 AM <br />To: Benyam Stephanos <br />Subject: Barjack Clearing & Grading Permit <br />Mary Cunningham is okay with the wetland study. However, if the buffer shown r,f the site plan is within a slope of 25% or <br />greater, the required buffer must extend 25 feet beyond the top of slope. They should show slopes of 25% or greater on <br />their site plan. <br />Steven 2j,ingafs6c <br />Associate Planncr <br />Planning & Community Devclopment Department <br />City of Everett <br />3200 Cedar Strect <br />Gvcrett, WA 98201 <br />(425)257-8941 <br />