Laserfiche WebLink
Page z <br />Work Activity Work Order o4�l4�Zooa 13:21 <br />Work Order Number 20000363 <br />FQLIIPMENT: �_— <br />ID DESCRIPTION Date Units Cost <br />MATERIAL: <br />ID <br />BLOW38119047 <br />BOX000044647 <br />BOX000056147 <br />COUP38007347 <br />COUP38007447 <br />�LL038107947 <br />ELL0381079C7 <br />INSE38021047 <br />INSE38021047 <br />NIPP38133847 <br />PIPE38060947 <br />VALV3B034348 <br />MISCELLANEOUS: <br />ID <br />DESCRtPTION <br />BLOWOFF 2 BELOW GROUND HYDRANT <br />BOX VALVE 5 PLASTIC TOP BOTTOM <br />BOX METER PLASTIC 77 X 30 W/ <br />COUPLING 2 MIP X 2 CTS COMPRES <br />COUPLING 2 FIP X 2 CTS COMPRES <br />ELL 2 90 DEG STREET BRASS <br />ELL 2 90 DEG STREET BRASS <br />INSERT STIFFENERS 2 CTS <br />INSERT STIFFENERS 2 CTS <br />NIPPLE 2 X CLOSE BRASS <br />PIPE 2 POLY C.T.S.100 ROLLS <br />VALVE GATE 2 SUPER HEAVY DUTY <br />DESCRIPTION <br />Sub Totat <br />Date Units Cost <br />oana2000 <br />Oy20/2000 <br />03/20I2000 <br />03/21I2000 <br />03I21I2000 <br />03I2012000 <br />03120l2000 <br />03/20I2000 <br />03I20I2000 <br />03I21I2000 <br />03I2012000 <br />03I20/2000 <br />�.ao <br />1.Q0 <br />1.00 <br />1.00 <br />1.CY1 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />5.00 <br />1.00 <br />Sub Total <br />Date Units <br />Sub Total <br />$234.58 <br />$30.�9 <br />$71.68 <br />$19.51 <br />$19.63 <br />$9.02 <br />$9.02 <br />$1.03 <br />$1.03 <br />$3.07 <br />Sa.n <br />$105.67 <br />sso9.�o <br />Cost <br />50.00 <br />