Laserfiche WebLink
'� CLOSSD CM 1PORR ORDSRS R$PORT <br />Total Utility Maintenance Management Syatem <br />09 09/1998 Pa e 1 <br />oJ�r 5 oeo g <br />________________________1=====_____=__==_______ <br />Date Range :06/24/1900 - 09/01/1998 <br />CM Work Order Range :0810800810001 - UT2830-30-322Patter,n :5201186760009 <br />Item Range :<Blank> - WVL3694L05 Pattern :* <br />Program aI,L Function ALL Activity ALL <br />----------------------------------------- <br />CM WORK ORDER ID: 5201186760009 Title: <br />«DU?LICATE PRINTING OF THIS WORK ORDER» <br />Item ID: -- <br />Location ID: -- <br />Program 520 Fuziction 118 <br />Date Completed� Oeji2/1998 <br />Overall Craft: <br />Issued: 08/10/1998 <br />Out of Service? NO <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft ID <br />DL II .GDK <br />SUP2 GJ <br />DL II GJM <br />UL MWE <br />WST NSO <br />SUP I OBJ <br />DLII RBL <br />Materiale: <br />ID <br />METE44125447 <br />N/A <br />Vehicles: <br />ID <br />VG017 <br />V2085 <br />V2171 <br />V215i <br />VHOOlv <br />VJ0020 <br />--------------------------------------- <br />REPLACE 9009 56TH ST SE <br />Activity 676 <br />Issued by: RJW Assigned to: GJ <br />Prio:rity: 'I'ravel Time: 0.00 Hr. <br />Name <br />------------------------------ <br />GOOD, DANIEL K. <br />GARZA, JOHN (NMI) <br />GORE, JAMES M. <br />MOORE, WARREN E. <br />NIEiSEN, �COTT O. <br />O'LEARY, BRIAN J. <br />RICHARDS, BEN L. <br />Planned Hrs <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />C.UO <br />0.00 <br />0.00 <br />ACtual Hrs <br />5.00 <br />4.00 <br />5.00 <br />12.00 <br />12.00 <br />8.00 <br />5.00 <br />Total Labor Cost: <br />Description Date # Used <br />------------------------------ -------- -------- <br />METER 6" NEPTUNE PROTECTUS 111 OB/17/1998 1 <br />6" FLANG�; KIT OS/17/1998 2 <br />Descripti�n <br />------------------------------ <br />94 FORD AEROSTAR VAN <br />91 GMC PU 4x4 <br />92 CHEV 1-TON <br />96 CHEV 1 TON HYD. UNIT <br />96 CAT BACKHOE <br />'36 FORD DUMP 10 YARD <br />Total Material Cost: <br />Hours Cost <br />4.00 18.80 <br />4.�0 20.80 <br />12.00 62.4C <br />12.00 67.�C <br />12.00 302.40 <br />8.00 177.60 <br />---------- <br />Total Vehicle Cost: 649.20 <br />Cost <br />45.00 <br />1:,0.08 <br />45.00 <br />196.08 <br />249.24 <br />164.96 <br />45.00 <br />851.36 <br />Cost <br />6855.95 <br />12.46 <br />6868.41 <br />� ���� <br />G�ss.ys <br />