Laserfiche WebLink
l <br /> PUBLIC WORKS PERMIT COMMENTS <br /> 4. As per Public WorKs approved plan dated <br /> 5. Connect side sewer per City Standard #601. <br /> �; Connect side sewer per City Standard �#'s 601, 602, 604. <br /> �� <br /> 7. Connect all rooftop downspouts to the side sewer. <br /> 8. Connect rooftop downspouts to the drainage system provided for this lot. <br /> ( 9. i Rooftop runoff r�iust be discharged to a roof downspout infiltration system per City of Everett <br /> `� Storm Manual 3-2.6.2. The approximate size trench is 3.5' wide, 2' deep and 25' long. See <br /> attachment for more details. <br /> 10 j The contractor must meet with the Public Works Inspector to discuss potential d-3inage <br /> routing prior to beginning the project. <br /> 11. Install erosion control measures as determined by the Public Works inspector, such as silt <br /> fence, straw bale�, swales, or erosion blankets. <br /> 12. Install erosion control measures per City of Everett Standards for small parcels <br /> 13~ Remove erosion control measures upon completion of the project prior ta final approval of the <br /> permit. <br /> 14. All excavated material from foundation, sidewalk and driveways shall be hauled to an <br /> approved, permitted site. No wastiny of material is allowed on this building lot. <br /> 15. Remove and replace curb, gutter and s�dewalk as per City of EvereY Standard Pian #'s 305A <br /> & 306 on this proposal's frontage as din;cted by the Public Works Inspector(i.e. all unused <br /> driveways and any broken or damaged aarea must be replaced). <br /> 16. Install a Type I concrete driveway per City of Everett Standard #307. <br /> 17. Pave driveway from the front property line out to the street paving. <br /> 18. � Contact the rU /��iT Water District for connec;ing provisions for this building's <br /> water and sewer services. <br /> 19. A catch basin as per City Standard Plan #402 with a gas trap per Stzndard Plan #410 is <br /> required for the parking area. <br /> 20. If a sewer pump system is to be installed, the pressure line must discharge into a private <br /> manhole, then gravity flow across the public right-of-way. <br /> 21. A sprinkler system is required for this building in compliance with the requirements of NFDA <br /> Standards ?3D. <br /> PWComments � <br /> � <br />