Laserfiche WebLink
, <br /> � <br /> PUBLIC WORKS PERMIT COMMENTS <br /> 4. As ;ar Pi!�lic�Norks approved plan dated <br /> 5. Connect side sewer per City Standard #601. <br /> � Connect side sewer per City Standard #'s 601, 602, 604. <br /> 7. Connect all rooftop downspouts to the side sewer. <br /> $. Connect rooftop downspouts to the drainage system provided for this lot. <br /> � Rooftop runoff must be discharged tu a roof downspout infiltration system per City of Everett <br /> Storm f,ianuai 3-2.6.2. The approximate size trench is 3.5' wide, 2' deep and 25' long. See <br /> attachment for more details. <br /> 10 The contractor must meet with the Public Works Inspector to discuss potential drainage <br /> routing prior to beginning the project. <br /> 11. install erosion control measures as determined by the Public Works inspector, such as silt <br /> fence, straw bales, swales, or erosion blankets. <br /> -�� Install erosion control measures per City of Everett Standards for small parcels <br /> �3� Remove erosion control measures upon completion of the project prior to final approvai of the <br /> permit. <br /> 14. All excavated material from foundation, sidewalk and driveways shall be hauled to an <br /> approved, permitted site. No wasting of material is allowed on this building lot. <br /> 15. Remove and rep�ace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A <br /> & 306 on this proposal's frontage as directed by the Public Works Inspector(i.e. all unused <br /> driveways and any broken or d2maged area must be replaced). <br /> 16. Install a Type I concrete driveway per City of Everett Standard #307. <br /> 17. Pave driveway from the front property line out to the street pa.�ing. <br /> 18.� Contact the �vc1-�TT Water District for connectiny provisions for this buildinn's <br /> water and sewer services. <br /> 19. A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan #410 is <br /> required for the parking area. <br /> 20. If a sewer pump system is to be installed, the pressure line must discharge into a private <br /> manhole, then gravity flow across the public right-of-way. <br /> 21. A sprinkler system is required for this building in compliance with the requirements of NFpA <br /> Standards 13D. <br /> PWCommznls 1� <br />