My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4927 23RD AVE W 2016-01-01 MF Import
>
Address Records
>
23RD AVE W
>
4927
>
4927 23RD AVE W 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2017 8:29:56 AM
Creation date
4/1/2017 8:29:42 AM
Metadata
Fields
Template:
Address Document
Street Name
23RD AVE W
Street Number
4927
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DAVID L. NELSON AND ASSOCIATES, INC. <br /> Consulting Enginecring Geoiogy <br /> September 19, 1989 <br /> Project No. 12489 <br /> Page 6 <br /> Adequate drainage should be provided around the structure area. We si:ggest <br /> the use of foundation and roof drain systems, independently directed into the <br /> main storm and site drainage system, away from the slope area. Site grading <br /> should be performed to direct all surface watars away from the structure and <br /> slope area. All work performed within the setback, including excavations or <br /> ' landscaping should be performed with adequate drainage, where all surface <br /> � waters are directed into a controlled system and properly daylighted away from <br /> � the slope. <br /> ( Site drainage may require an outfall pipe systr.m which discharges down over <br /> the steep slope area to the creek area below, if drainage cannot be directed <br /> � to the drainage control system within the street. If this is required, we <br /> suggest the system be a tight-line, and utilize a non-jointed, non-ultraviolet <br /> � sensitive pipe, placed directly upon the slope surface, and dischar3e �nto an <br /> erosion protected outfall located at the toe of the steep slope. The pipe <br /> � could be anchored to the slope, but disturbance to the slope surface should be <br /> avoided. <br /> , Any exposed soils areas within the top-of-slope or slope areas shculd be <br /> protected from erosion and weathering. We suggest the use of jute netting, <br /> � hydro-seeding or adequate vegetation planting f�r erosi�n control . <br /> � Additional Notes <br /> Inspection of the earthwork phase of development should be performed. This <br /> 7 should include excavations, foundation placement and drainage. <br /> i � <br /> � Although we do expect site soil types, conditions and distributions to reflect <br /> our findings, some variations could occur. Should conditions other than those <br /> discussed herein be encountered, the geotechnical consultant should be <br /> � notified for review and comment. Additional or alternative recommendations <br /> may be required. <br /> � <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.