My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5117 23RD AVE W 2016-01-01 MF Import
>
Address Records
>
23RD AVE W
>
5117
>
5117 23RD AVE W 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2017 9:02:21 AM
Creation date
4/1/2017 9:01:53 AM
Metadata
Fields
Template:
Address Document
Street Name
23RD AVE W
Street Number
5117
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geotechnical Engineering Report <br /> . _ 51 17 23"�Ave W <br /> January 2, 2009 <br /> RMl Filc No. 50909 <br /> 1'ag�9 <br /> This report is issued with the una�rs�anding that it is the responsibility of the owner or his representative <br /> to ensure that the infortna[ion and recommendations contained in this report are called to the attention of <br /> al! concerned parties and incorporated into the plans and that the necessary steps are taken tn see that the <br /> contractors or subcontractors carry out such recommendations in the field. <br /> All pcople who own or occupy homes on or below hillsides should realize that landslide movements are <br /> always a possibility, although the likclihood is low that such an event will actually occur. The landowner <br /> should periodiailly inspect the slope,especially after a winter storm. If distress is evident, a geotechnical <br /> engineer shoi:ld be contacted for advice oa remedial/preventative measures. The probability that <br /> landsliding will occur is substantially reduced by the proper maintenance of drainage measures at the <br /> site. Therefore, the homcowner should recognize the responsibility for performing 5uch maintenance. <br /> Consequendy, we recommend lhat a copy of our report be provided to any future homeowners of the <br /> property if the home is sold. <br /> We suggest that we provid� observation of the earthwork phases of any proposed construction project. <br /> This should include grading, foundation construction, and aetbacks, drainage inctallation, and erosion <br /> control measures. Although we expect sitc geology, soil types, conditions, and distributions to be as <br /> discussed herein, some variations in subsurface conditions could occur. Should conditions other than <br /> those discussed above be encountered, the gcotechnical consultant should be notified for review and <br /> commenL Additional or alternative recommendations may be required. <br /> USE OF THIS REPORT <br /> This report is thc properly of RMI ASSOCIATES LLC and has been prepared for Ms. Mei Yang and <br /> hcr agents for use in planning and desi�� of this project on this site only. The data and report should be <br /> provided to prospective contractors for thcir bidding and estimating purposes, but our report, conclusions <br /> and interpretatiuns should not bc construed as a wartanry of subsudace conditions. At the time of this <br /> report, final plans werc not available. We recommend that we Le retained to review final plans prior to <br /> the start of construction to check for conformance with the recommendations in this report. <br /> 1'hc scope of our work does not include services related to construction safety precautions, and our <br /> rccommcndations arc not intcndcd to direct the contnctors' methods, techniques, sequences or <br /> procedures, except as specifically descrihed in ow report for consideration in design. There are possible <br /> RMI ASSOCIATES LLC j�� ��P <br />
The URL can be used to link to this page
Your browser does not support the video tag.