Laserfiche WebLink
l � <br /> PUBLIC WORKS PERMIT COMMENTS <br /> 4. Connect side sewer per City Standard#601. <br /> 5. Connect side sewer per City Standard #'s 601, 602, 60A. <br /> 6. Connect all rooft�p downspouts to lhe side sewer. <br /> 7. Connect rooflop downspouts to the drainage system provided for this lot. <br /> 8. Rocftop runoff must be discharged to a roo(downspout infiltration system per City of Everett Storm <br /> Manual 3-2.6.2. The appreximate size lrench is 3.5' wide, 2'deep and 25' iong. See attachment ior <br /> more details. <br /> � The contractor must rneet with tfie Public W orks Inspector to discuss potential drainage rouling prior to <br /> beginning the project. <br /> 10. Install erosion control measures as delermined by the Public Works inspector, such as silt fence, straw <br /> bales, swales, or erosion blankets. <br /> 11. Install erosion conlrol measures per City of Everett Standards fur small parcels <br /> 12. Remove erosion control measures upon complelion o(the project prior io final approval of lhe permit. <br /> 13. All excavated material from foundation, sidewalk and driveways sliall be hauled to an approved, <br /> ps,mitled site. No wasling of material is allowed on lhis building bl. <br /> 14� No dirt, mud, rocks or debris to be tracked onto roadway. <br /> 15, No bu�lding materials lo be stacked on sidewalks and sidewalks to be kepl clea.i and open for <br /> pedeslrian travel. <br /> 1 G. Adjust water meler box 1"above sidewalk grade. <br /> 17. Remove and replace curb, g�ller and sidewalk as per City of Everetl Standard Plan #'s 305A& 306 on <br /> lhis proposal's frontage as directed by the Public Works Inspector (i.e. all unused driveways and any <br /> broken or damac�ed area must be replaced). <br /> 18. Install a Type I concrete driveway per Ciry o( EvereU Slandard �f307. <br /> 19. Pave driveway from the fronl property line out b the slreet paving. <br /> 20. Contact the Wate-District for connecting provisions for this building's water and <br /> sewer services. <br /> 21. A catch basin as per City Standard Plan#407 witl� a gas trap per Standard Plan#410 is required for lhe <br /> parking area. <br /> 22. if a sewer pump system is to be installed, the pressure line must discharge inlo a private manhole, ihen <br /> gravity flow across the public righl-of-way. ' <br /> 23. A sprinkler syslem is required (or this building in compliance with the requirements of NFDA Standards <br /> 13D. <br /> P��I��Of1101^fl!5 Z/ <br /> � Z <br />