Laserfiche WebLink
everett INSPECYION REPORT <br /> � Address _ FJ��1 I oCdi �.%� /"�V� l.�� <br /> Contractor . o � <br /> Owner ��'�� ) �,cca�ac�r� <br /> Date ���C�'7 <br /> TYPE OF INSPECTION REQUESTED <br /> ❑ BLDG: Pmt No. ❑ MECH: Pmt. No. <br /> �EkEC: Pmt. No. �—�❑ PLBG: Pmt No. <br /> ❑Temp. Elect. O Framing ❑ Gas Piping <br /> ❑ Footing ❑ Drywall, �ailing ❑ Consultation <br /> ❑ Foundation ❑ Shear Nailing ❑ Groundwork <br /> ❑ Ductwork ❑ Grid 4 S?-uct. Siab <br /> O Wood Stove Rough-In y�Eina��� �L.� <br /> ❑ Masonry �� ❑ <br /> 6� APPROVAL ❑ PARTIAL APPROVAL • <br /> ❑ VIOLATION ❑ CORRECTION REQUIRED <br /> ❑ Corrections listed below MUST BE MADE before work can be approved. <br /> ❑ Please contact inepector and arrange for appointment. <br /> ❑ Was not able to perform inspection. <br /> ❑ CtiLL 259-8810 FOR REINSPECTION — 24 hour notice required. <br /> A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br /> THE PREMISES PRIOR TO OCCUPANCY. <br /> � -�' ,/� _ �; , <br /> � <br /> , F <br /> . _ ya\�,�t. <br /> � . ` vfiX;dA. <br /> Inspector _�/�(� Date � <br /> i <br />