My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10021 23RD DR SE 2016-01-01 MF Import
>
Address Records
>
23RD DR SE
>
10021
>
10021 23RD DR SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2017 9:17:39 AM
Creation date
4/1/2017 9:17:28 AM
Metadata
Fields
Template:
Address Document
Street Name
23RD DR SE
Street Number
10021
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SrR <br /> OVER-THE-COUNTER BUILDING PERMIT CHECKLIST FOR RESIDENTIAL SOLAR <br /> PHOTOVOLTAIC SYSTEMS: ROOFTOP MOUNTED <br /> Contractors can apply for on Over-The-Counter(OTCJ permit where the PV system mee[s the requirements listed <br /> in this Checklist.AI!project plans and supporting documentation must be provided on site Jor the inspector. <br /> --------TO BE COMPLETED BY APPLICANT------- <br /> Q Project Informatian <br /> PropeRy Owner Name: E <br /> ProjectAddress: 10�21 'L3°3 �Q_SE ParcelB <br /> City: �lE2ETT � Sta[e: �A ZIP: �� <br /> �ayPhone: �(2S'SZZ-2.C�Zlo <br /> ContracrorName WE 2�J So�A2 <br /> Contre�tor Liccnse H: [-5�E �C �� � <br /> Contractor Day Phone: �O-��{(o-�g5`�j <br /> PVsystemdescription Zpl �,�t� 'Z�� jo(�,-1� fy^-� /Ll���cryS���rK So�.,��od�'cy <br /> (include manufacturer � / <br /> andmodelAofPV �'�� FLTC-� �FI� �•`�nCtiw+�•,( �uvERTfQ <br /> modulesand HE-� �L <br /> inverters): _ <br /> QDetermine if your project qualifies for expedited permitting: <br /> Yes No <br /> 1. PV system is designed and proposed for a detached one-or two-family dwelling or <br /> townhouse not more than three stories above grade or detached accessory structure that � � <br /> is code compliant to setbacks and height, or code allows expansion of nonconformity for <br /> solar modules. (IRC 101.21 <br /> 7.. Modules on pitched roofs do not exceed the highes[point of the roof unless approved by �, � <br /> the local jurisdiction. <br /> 3. Rooftop is made from lightweight material such as a single Iayer of composition shingles, � � <br /> metal roofing, lightweight masonry,or cedar shingles. � <br /> 4. The installation shall comply with the manufacturer's instructions. �IRC M2302.2) � ❑ <br /> 5. The installation shall meet the requirements of NFPA 70 National Flectric Code, and all <br /> required electrical permit(s) must be obtained from the�uthoriry Having Jurisdiction to J�' ❑ <br /> administer the electrical code. (IRC M2302.2� <br /> G. The installation shall meci the requirements of[he Internationcl Fire Code as amended � � <br /> by WA State. �IRC M2302.2� <br /> 7. The PV system is designed for the wind speed of the local area, and H�:II be installed per �. � <br /> the manufacWrets specifications. �IRC M2302.2.1(1)� <br /> 8. ihe gwund snow load does not exceed 70 pounds per square foot. �IRC M"13021.1�2�� I� ❑ <br /> 9. Tot I dead load of modules, suEiports, mountings, raceways and all o[her appurtenances <br /> weigh no more than four pounds per squar2e f91o,t1. �IRC M2302.2.1(3�) 0 � <br /> Enter total dead load of system (Ibs/ft7�: �� <br /> S0. 7o address uplift, modules are mounted no higher than 18"above the surface of the � �� <br /> roofing to which they are affixed. �IRC M2302.2.1�4�1 <br /> I <br /> Z <br />
The URL can be used to link to this page
Your browser does not support the video tag.