My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5700 23RD DR W 2016-01-01 MF Import
>
Address Records
>
23RD DR W
>
5700
>
5700 23RD DR W 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2018 9:18:51 AM
Creation date
4/1/2017 9:48:28 AM
Metadata
Fields
Template:
Address Document
Street Name
23RD DR W
Street Number
5700
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
984
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. �- � � L' <br /> prvBtic wo� ( "� <br /> September 2, 1999 .. — <br /> Connie St. George � � � Q � � <br /> Gary Parkinson Architects � D <br /> 2812 Colby Avenue <br /> Everect, WA 98201 5�P 2 3 i999 <br /> Subject: Project: Northshore Christian Church CITY OF �VERETT � � <br /> , Address: 5700 - 23" Dr W f�ormit Servicos <br /> ' Plan Check No. B9908-018 <br /> Dear Ms St. Creorge: <br /> In response to your application for a construction permit, your plans have been re- <br /> examined and you are advised that the issuance of a permit is being withheld for the <br /> reasons listed on the attached. These comments address buiiding issues only. Addidonal �I <br /> revisions or addidons may be required by other departments (such as Utilities, Planning <br /> or Fire). All references refer to the 1994 Uniform Building Code, as amended by the <br /> State of Washington and/or Washington State Energy Code 1994 Edition, unless stated <br /> c:hecwise. <br /> In order For the processing of your application to continue, it will be necessary to <br /> provide the Building Divfsion with two canplete new sets of drawings retlecWg the <br /> corrections requested. <br /> '�General <br /> �r. <br /> L o the reatest extent <br /> • 8 possible, information such as occupancy, area, assurt�ed <br /> �j�� - property line locations (between buildings) and type of construction should be <br /> provided for the future phases of work. This informatior. may have bearing on the <br /> � current project. <br /> ( 2. e wall in Detail 9/S-10 appears to be load bearing (per definition Section 224). <br /> �' `�._ is should be verified as the fire-resistance may change based on Table 5-A. <br /> Further, If phase N creates an intcrior wall out of the glass curtain wall at the lobby, � <br /> � that wall would require a minimum one-hour fire rating per Table 6-A. <br /> ' / . Further clarification should be provided regardiag the educational portion of the <br /> � - project. Specifically, we are concerned about the classtooms - how many chi!dren <br /> per room, what is the teacher to child ratio, the ages of the children, hours assceiated <br /> CITY OF EVERETT• 3200 Cedar Sfreet• Everett,WA 98201 • (425)257-8800•Fax(425)257-8856 <br />
The URL can be used to link to this page
Your browser does not support the video tag.