Laserfiche WebLink
� Attachment I <br /> Northshore Christian Church and Academv <br /> Phased Master Plan Develo ment Schedule � <br /> Phasel Zppp <br /> Multipurpose Building <br /> Children's Wing <br /> Atrium/Lobby <br /> Phase 1.5 Zppp <br /> Two Office Portables <br /> Twelve Academy Classroom Portables <br /> SPRUNG Structure Youth Center <br /> Impacts - Drainage: Covered under 95% impervious area design <br /> Traffic: Covered in current traffic study <br /> Phase II 2002 <br /> Academy Buitding (K-8) <br /> Reduce to six Acldemy Portables <br /> No drainage or traffic impacts <br /> Phase III , <br /> Academy Bui;. ._j ;9-12) <br /> Remove Acadei;ry Portables <br /> No drainage impacts <br /> Restudy of traffic impacts may be required based � i Academy <br /> enrollments and area traffic in 2004 , <br /> Phase IV 2006 <br /> Worship Center <br /> Administrative Offices <br /> Additional Parking <br /> Remove Office Portables <br /> Remove SPRUNG Structure <br /> No drainage or further traffic impacts <br /> Phase V 2008 <br /> Gymnasium <br /> No Impact <br /> i <br /> Mary Cunningl�am,E�crcu Cit��Plaruur I <br /> Mar•26. 1�)99 � <br /> � <br />