My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5801 23RD DR W BASE FILE 2016-01-01 MF Import
>
Address Records
>
23RD DR W
>
5801
>
BASE FILE
>
5801 23RD DR W BASE FILE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2017 1:15:28 PM
Creation date
4/1/2017 9:53:44 AM
Metadata
Fields
Template:
Address Document
Street Name
23RD DR W
Street Number
5801
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
construction limits shall be clearly �ho�� ::.. consiruction plans. Construction limits shall be clearly <br /> marked in the feld with oranoe construction fencing. <br /> • Work shall be done so as to minimize:urbidity,erosion, and other water quality impacts. <br /> • Proper crosion and sediment conirol meusures shall be follo�red m prevent sediments frcm entering crerks <br /> or Hv;lends. Erosion control measures shall be approved by the Department of Engineerine and Public <br /> Services and/or agencies with jurisdiction. Measures may include,but not be limi[ed to, placing plywood <br /> across the area where equipment will operate; mulching the «�edand areas where equipment will operate; <br /> placing wood chips atop a flexible mat to help prevent compaction (the wood chips and mat must be <br /> removed following consvuction); placing silt fences and hay bales between consvuction areas and all <br /> adjacent wedands and strcams; and placing ecolooy ulocks behveen consmiction areas and streams or <br /> wedands when a temporary fill is useJ for roads,etc. <br /> • Erosion control n;easures shall be in place ard inspected prior to commcncement of work. All erosion <br /> control strucmres shall be inspected regularly to ensure they are main[ained in working order. <br /> • If the corzidor necds ta be de�satered m do[Be work, the watcr should be pumped ro a sedimentation pond <br /> where all solids can settle or xn area where it can sheet @ow be(ore being discharged back to the stream or <br /> wedand. Turbidiq�levels in associated wctlands and strrsms shall not exceed thc standards in WAC 173- <br /> 201A. <br /> • Am� excavation materials must bc placcd in an upland area during construction. 1Vedand soils must be in <br /> separate piles Gom upland soils. After construction, wetland soils should bc retumed to the�acdand and <br /> upland salls placed in upinnd arcas. At a minimum,the top I S inches o!'topsails from wetland areas shall <br /> be stored separately from the rest of the srils anJ replaced as the eop layer of fill in the wetlands following <br /> construction. Care must be taken not to n�ake "dams" from compacted fill that�could alter ar.q subsurface <br /> (lo�v. <br /> • If a pipe is being trenched Ihroii;h the area, measures sh�ll bc taken to prevent the de-�vatering of the <br /> �vetland(e.g. cut off collars,et:.). <br /> • �Vhen operating machinery in or near water, estreme c:�rc shall be taken to prevent uny petroleum products, <br /> cement,chemicals,or other rocic or deleierious materials from entering the watee If a spill does occur, <br /> work shall be stoppzd immedi�eely and Ccology's Spill Response Section cantacted. <br /> • Lquipment maintenanm shall not occur in or adjacent to wedands and streams. <br /> • ARer construction, the si[e must be remmed to its original grades. Care must be taken to not drain <br /> ' �vetlmids or alter���at:r flo���s or patterns. <br /> I • \'��henever feasible, if wetland plant species are not im�asive, diey shou!d be removed prior m construction <br /> and placed aside in a shady damp location, such as under��•et burlap sacks. Folluwing construct:on,they <br /> I should be rcplaced in the wetland arca. <br /> • Kevc,etation: At a minimum,erosion control revegetation is required in aU eleared arcas and should <br /> include herbaceous ground cover that does not interfere with establisiunent of native vegetation. If long- <br /> tcrm reve�,etation is required, it should be uccomplished during the nes[most favorable time of year fcr the <br /> particular vegetation to ensure the highest le��el of success. (Note: If revegeta[ion does not occur <br /> immcdiatel} follu�aine recuntourine of the site,edequatz erosion convol measures must�e taken.) Native <br /> species compatible�vith preconswetion vegetation patterns shall be used for revegetation. Degraded <br /> emcrgent sites,such as Reed canary erass fields,shall be replanted with species that are represen[a[ive of a <br /> hi�:her quality cinergent,scrub-shrub or forested wetland. If reve�etation is requirtd,monitoring should <br /> orcur once a year for a minimum of t�ro years. (S[PA 1Vater, Plant and Animal,and Land and Shoreline <br /> Use Policies) � <br /> � �I �/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.