Laserfiche WebLink
I If the [3-I zoned property at the comer of Glenwood and Merrill Creek Parkway develops with residential uses, <br /> thc applicant must voluntarily mitieate impacts to the;vtukilteo School District in a manner aceeptable to the <br /> District. A written letter or agreement must be provided to the Ciry by!he School District or applicant prior to <br /> issuance of permits for the property. If an agreement is not provided, additional SEPA review�ti•ill be required. <br /> (SEP}1 Public Services Policies) <br /> 8.4 PARKS AND RECREATION <br /> 8.4.1 Threshold <br /> None <br /> 8.4.3 17itigation Nlcasures <br /> I. When a trail system plan is adopted as part of[he City's Comprehensive Plan,and when development is <br /> proposed on a parcel on or adjacent to a proposed trail per the adopted plan, th:re must be compliance with the <br /> trail system plan. (SEPA Land and Shoreline Use and Transportation Policies) <br /> 8.5 COMMUNICATIO�S <br /> 3.5.1 Tiiresl�old <br /> Most communicstion facilitics are exempt from SEP.4 review. This SEPA anal�sis covers all aboveground <br /> commm�ication facilities provided that view analysis is completed in the Special Propem�Use permit process. <br /> This analysis does not cover any strucmre that the PAA determincs may have u significant adverse affect un <br /> navigable airspace around Paine f ield .4irport. <br /> 8.5.3 Mitigalior� Mcasures <br /> L All communication lines must be installed underground. (SEPA Public Sen�ices and Land and Shoreline Use <br /> Policies) <br /> 3. The Spccial Praperty Use permit process for�boveground utilities must include analysis of impacts to views <br /> Gom the p-opased facilities. In addition, Special Property Use pertnits should only be approved when the <br /> desiSn of Aie aboveground communication facilities are compatible �vith nearby struceures and/or screened Crom <br /> view. (SC•PA Public Services and Land and Shorcline Use Policies) <br /> 3. Antennae and tower proposuls and all proposals for structures to be added to the top of existing buildings: the <br /> PAA must b�notitied prior to issuance of a detertnination of consisrency ro determine if the strucmre�aill af(ect <br /> navigable airspace. All recommendations of the FAA must be complied with. (SEPA Land and Shareline Use <br /> Policies) <br /> S.G PUI3LICIVAT[:i< SUPPLIBS <br /> 8.6.1 Threshold <br /> The analysis in the 11'ater Svsreru Plnn projected the overall fuwre peak-hour demand for the area at 2.7 gpm/acre <br /> (approximately 4,000 gpy'day peak flow), and assumed fire flo�v requirements of approximately 3,500 gpm for <br /> commercial and industrialhnanufacturing uses. Based upon the proposed design of die water sysrem, any <br /> de��lopment using more than ?J gpm/acre has the potential w affect water pressure or, other sites. Additional <br /> ;m�h sis will be required for development proposals with a peak hour demand abovc 2J gpmJacre and�or a tire Flow <br /> ,�� <br /> � /�( 3� <br />