Laserfiche WebLink
� � <br /> Capacity of Ihe system is 1,700 gallons per gross acre per daq, and 4,000 gallons per gross acre per day of <br /> instantaneous peak tlo�v. <br /> Some sites may have capaciq� in escess of the threshold available to serve po[ential users. If a proposal would <br /> exceed I,790�allons per gross acre per day and/or 4,000 gallons per gross acre per day of instantaneous peak flow, <br /> additional analysis will be required. The additional analysis may be as simple as calculations completed by the <br /> ?ublic Worka Jepartrnent prior to a pre-application mee[ing on a specific development proposal. The additional <br /> analytis must �etermine how the proposal's sewer demand will affect[he sewer system. Projecl.with no additional <br /> major improvements needed and no adverse cumulative impacts on the sewer system are covered by this analysis. <br /> Additional SEPA analysis will be required for projects that may require major improvements not identified in the <br /> CIS or that may have adverse cumulative impacts on the sewer system. <br /> The EIS analysis does not cover the impacts of construction of a new sewer main across Japanese Gulci;. Additional <br /> analysis is requind to review alternative routes(or the line which will minimize the impacts of the propo,al,or <br /> altemative means of providing sewers to that area. <br /> SJ.3 Mitigntion Meusures <br /> I. Individual Jevelupments may be responsible for funding�II ar a ponion of sewer system capital improvements <br /> as sho�an in Table 8-2 (Table 3.8-4 in the LIS). (SEPA Public Sen�ices and Utilities Policies) <br /> _ �� � <br /> 1�� I 1 / <br /> , � <br /> � <br />