Laserfiche WebLink
-t. Chis pruject must comply with the current City of Everett Buildinc Code and Sprinkler <br /> Ordinance. <br /> �. Special charges for connection to die sewer and water systems in accordance with <br /> Ordinance 1998-94 and subsequent revision are applicable. These cnarges are based on <br /> projec,ted �vater usage and can be substantial. Applicant is encouraged to obtain a copy of <br /> the Ordinance and determine estia:ated charges prior to building permit application. The <br /> actual charges shall be compu,ed by the Public �Vorks Department per the ordinance in <br /> effect at Qie time and according to the informatior.on [he approved plans at the time oF <br /> building permit issuance. <br /> 6. Lach of comment on the plans submittcd with the application does not constitute <br /> approval of diesc plans. <br /> 7. A fire hydrant is required ���ithin 3�0 driving Ieet oFevery structure. The hydrant(s) must <br /> meet City Specifications <br /> 8. Cily streets are to be kept cfear of dirt and debris at all tintes during cons[ruction. Dust <br /> suppressi�n and sueet deaning must occur as directed by die Pttblic �Vorks Inspector. <br /> 9. A one-yc�r warranty is requircd on thc public improvement for an amount not less than <br /> 10`% of the cost of ronstruction and shall run for one year from the date issuance of the <br /> Iirst Occupanc}' Permit. <br /> 10. A hvo-year guarantee is required for private retcntion/deten[ion or other drainage <br /> treatmendabatement facilities serving areas larger than one acre. <br /> 1 l. On-site water main wil! be staked ���ithin an easement to the City. The easement �vill be <br /> submitted to the City prior to issumue of permits. <br /> 1_. As-builts of storm se�ver, sanitary se��er, and ���ater systems will be required to be <br /> submitted per City Desion and Ccnstruction Standards and Specifir.ations for <br /> llevelopment. <br /> 13. Any broken or damaged side�ealk shall be repaired/replaced per thf: Ciq� Public Norks <br /> Inspcctor. <br /> 14. A'✓alkways must ba provided each building ro the public sidewalk. _ <br /> 1�. rVl exposed growid must be reseeded within 30 days of the completion of construction. <br /> Il�reseeding is not practical due to ���eather or seasonal problems, tl;e eround must be <br /> covered ��ith mulch as directed by tlie City Eneineer. <br /> 16. Temporary erosion controf ineasures For construction activity mus[ be operational prior to <br /> commencement of any clearing or earth�vorh. <br /> � , � 3, � <br /> � I <br />