Laserfiche WebLink
� t <br /> Bridgeways <br /> Envelope Summury <br /> November 5.2009 <br /> Page 2 <br /> Floor Over: Metal joist, 3-1/2", with R-11 batt insulation. U =U.14, default (Table 10- <br /> 4A). <br /> Slab on �irade: No Insulation, F=0.73, default (Table 10-21. <br /> Please note that these values are minimurn insulation requirements for code compliance. <br /> Higher insulation values may be installed. SHGC = Solar Heat Gain Coefficient <br /> �/� <br /> � <br /> � <br />