Laserfiche WebLink
i <br /> I'm assuming that you are referring to the conditions where the new HVAC supports frame into the existing LH joists,as <br /> shown on our de?ails C-2 and G-2. For these cases,you should be able to drive 4 face nails and 4 top flange nails per <br /> hanger into the wood top plate,which is acceptable. <br /> Hopefully this h:�ps; let me know if you need anything else. <br /> Regards, <br /> Joel Kipple, P.E. <br /> Project Engineer <br /> ENGINEERS NORTHWEST INC., P.S. <br /> 6869 Woodlawn Ave.N.E.,M:OS <br /> Seattle,WA 98115 <br /> ahone (20G�5257560 <br /> phone direct (206)973 5427 <br /> f8X (206)5226E98 <br /> email loelk�enginecrsnw.rom <br /> website http://wv+w.enp,ineersnw.mm <br /> From: Matthew Comstock [mailto:matthew@meridianbi.com] <br /> Sent:Tuesday, August 23, 2011 3:58 PM <br /> To:jcelk@engineersnw.com <br /> Cc: Bob McCullough <br /> Subject: C.O.Everelt and HU5487F hangers <br /> Joel, <br /> Could you please provide me with an e-mail with verbage to the effect of: ENW is aware that 6 of the 8 fastener holes in <br /> the face of the HU548TF�re not over a freming member to which they could be fastened. For the purposes of this <br /> application,the remaining fastener points of the hanger will be sufficient. I will need it to show to the C.O.Ev inspector. <br /> Thanks, Mat Comstock <br /> 2 <br />