Laserfiche WebLink
Paee 5 of� <br /> A) The exterior siraps as supplied and engineered from Simpson have a prepunched pattem of 3" on center � <br /> for the nails. The print calls for 2"on center. The inspector would like confirm��fon that 3" is acceptable. If it <br /> needs to be 2"the framer would like confirmation that we can over nail them beyond the Simpson design. <br /> ':: ir � o�s •�h . .,, _ �f _ .. I .��,� _ � ��� ,. i ._ <br /> . . .,...� . , ;n � ;�; . . . . <br /> B)The siraps that are over the ceniral beam line are also prepunched at 3", so the same question as above, <br /> but also, it was not possible to nail every single nail hole available in these straps due to a conflict with the <br /> irusses. The trusses have steel plates that the straps lay over. Do we drill the truss plate to accommodate <br /> the nails, orjust leave ihose nails out? . <br /> � � � <br /> i, �,._� <br /> Sorry to be so iong winded, it's like painting a Picasso with crayons. <br /> Thank you, <br /> Jeff Facey <br /> Meridian Builders Inc. <br /> Office 206-686-4880 <br /> Cell 425-876-1716 <br /> 3/15/2010 <br />